Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Tuesday, November 24, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » GCC resumes SWD construction at Medavakkam Main Road

GCC resumes SWD construction at Medavakkam Main Road

Balamurugan SelvarajBy Balamurugan SelvarajMay 6, 2019No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: The Greater Chennai Corporation (GCC) has finally addressed the year-old plea of Ullagaram and Vanuvampet residents to re-lay storm water drains (SWD) that run along Medavakkam Main Road, Ullagaram.

A month ago, works to re-lay SWD near Ullagaram began since the road widening works that are on at Medavakkam Main Road is nearing completion.

Authorities dug open the road recently where the SWD channel was present and have begun construction works. Over 20 workers are involved to complete the work as soon as possible.

“Once the SWD works are over, we will level the entire stretch. It will take about two months to complete the entire flow,” said an official.

“I am happy that at least now, the works to construct SWDs started. But, I want authorities to make sure that the SWDs are properly laid and covered with culverts. I also request officials to enclose the SWDs with lids,” said Kanagavel, a resident.

Other problems around:
Due to these works, motorists plying on the stretch face problems, some even meet with accidents. There are also traffic snarls at many places, say residents.

“We know the works happening at the stretch is to make the road better, but when we face multiple problems due to those works, the feeling is not good. Earlier the road was narrow, but there were traffic cops to monitor the traffic. Now, there is no police personnel even during peak hours. Atleast the GCC authorities should have put barricades at places where the works are on. But they did not,” they added.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleChennai lad to take part in 2020 Olympics to be held in Japan
Next Article Motorists want size of platforms at Sabari Road reduced
Add A Comment

Comments are closed.

Latest Posts

Tasmac enforces digital payment above Rs 1,000 in Chennai

NT BureauNovember 23, 20260

The Tamil Nadu State Marketing Corporation (Tasmac) has implemented mandatory digital-only payments for retail liquor purchases exceeding Rs 1,000 across outlets in Chennai and neighbouring Tiruvallur East starting

Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR

PugazhNovember 23, 20260

Industrial and commercial properties require flooring that can withstand daily operational challenges. Manufacturing units, warehouses,…

TVK to present second phase of student educational awards on Nov 26, 27

NT BureauNovember 23, 20260

The Tamilaga Vettri Kazhagam (TVK) will host the second phase of its annual educational awards and financial assistance ceremony for meritorious Class 10 and Class 12 students at a private auditorium in Neelankarai,

Full ‘Beaver Supermoon’ to light up the sky tomorrow night

NT BureauNovember 23, 20260

Skywatchers across Tamil Nadu and India will witness a dazzling celestial spectacle on Tuesday, November 24, when the full ‘Beaver Supermoon’ illuminates the night sky, reaching its peak illumination at 8.23 pm IST.

Kim Jong Un ignores Trump’s multiple attempts to re-establish contact

NT BureauNovember 23, 20260

North Korean leader Kim Jong Un has repeatedly ignored outreach efforts by US President Donald Trump to revive bilateral dialogue, with Pyongyang’s mission at the United Nations even returning a personal letter from

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Tasmac enforces digital payment above Rs 1,000 in Chennai
  • Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR
  • TVK to present second phase of student educational awards on Nov 26, 27
  • Full ‘Beaver Supermoon’ to light up the sky tomorrow night
  • Kim Jong Un ignores Trump’s multiple attempts to re-establish contact
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 6   +   10   =  
Lost password?