Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Wednesday, November 25, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home Ā» ‘Plan on to release Fukushima water coming soon’

‘Plan on to release Fukushima water coming soon’

AgencyBy AgencyOctober 29, 2020No Comments
🌐 Translate ā–¾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
Yoshihide Suga

Tokyo: Japanese Prime Minister Yoshihide Suga said Wednesday that his government is working on the final details of a plan to release the massive amounts of radioactive water being stored at the wrecked Fukushima nuclear plant, a decision that has been delayed by protests.

More than nine years after the disaster, the government still hasn’t made clear what it will do with the water at the plant, though a release into the ocean has been largely speculated on in recent years.

We cannot put off our decision forever without making a plan, Suga told a parliamentary session Wednesday, saying the plant is running out of storage space. Based on discussions and expertise we’ve had, we will further deepen our discussion and responsibly make a decision at an appropriate time.

A government panel in February issued a report recommending releasing the water into the ocean as the most realistic plan. The government and the plant operator, Tokyo Electric Power Co., or TEPCO, say all radioactive materials but tritium can be safely removed, and that tritium is largely harmless.

The plant now has more than 1.2 million tons of the water stored in 1,000 huge tanks that occupy a large amount of space at the plant. TEPCO says that it will run out of space in the summer of 2022 and that the tanks hamper the decommissioning process.

Suga did not give a timeline, though a decision is expected in weeks, if not months. An actual release would be about two years away because TEPCO still has to set up a facility for a release and have it authorized by the Nuclear Regulation Authority, officials said. A controlled release of the water will take decades.

The plant suffered a triple meltdown in the March 2011 earthquake and tsunami and is undergoing decades-long decommissioning. The contaminated water, a mixture of injected cooling water and groundwater that flows into the reactor area, has accumulated since the accident. The government and TEPCO say water treatment systems can remove all but water-soluble tritium, though currently 70% of the water contains other radioactive materials exceeding allowable limits.

TEPCO says it can meet the safety standard by running the water for a second round of treatment before releasing it.

 

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleChina denies allegations of genocide in Xinjiang
Next Article Trump’s campaign website briefly hacked
Add A Comment

Comments are closed.

Latest Posts

Curtains come down on Pilot TheatreĀ 

NT BureauNovember 25, 20260

For generations of Chennai residents, Pilot Theatre was more than a place to watch films. Now, the iconic property in Royapettah is preparing for a new chapter. As the curtains gradually fall on its cinematic past, Pilot

World Occupational TherapyĀ  Day celebrated in ChennaiĀ 

NT BureauNovember 25, 20260

SRM College of Occupational Therapy, SRM Institute of Science and Technology (SRMIST), Kattankulathur, conducted the World Occupational Therapy Day 2026 celebration at the Hippocrates Auditorium.Ā 

XLRI to close registrations for MBA aspirants on Dec 6

NT BureauNovember 25, 20260

The registration window for the Xavier Aptitude Test (XAT) 2027 will close on December 6, 2026 for MBA/PGDM aspirants.Ā 

Over 2000 attend cardĀ  show in BengaluruĀ 

AgencyNovember 25, 20260

Bangalore Card Show (BCS) 2.0, positioned as India’s biggest Trading Card Game (TCG) gathering, concluded its second edition in Bengaluru, welcoming over 2,000 attendees across two days. Organised by Emerald Card

E-paper 25 November 2026

NT BureauNovember 25, 20260
About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Curtains come down on Pilot TheatreĀ 
  • World Occupational TherapyĀ  Day celebrated in ChennaiĀ 
  • XLRI to close registrations for MBA aspirants on Dec 6
  • Over 2000 attend cardĀ  show in BengaluruĀ 
  • E-paper 25 November 2026
Ā© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 1   +   1   =  
Lost password?