Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Monday, November 23, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Pakistan to shelve major CPEC power project

Pakistan to shelve major CPEC power project

PTIBy PTIJanuary 14, 2019No Comments
🌐 Translate â–Ÿ
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Islamabad: The Pakistan government will shelve a major coal-based power plant project under the USD 60 billion China-Pakistan Economic Corridor (CPEC), which connects Gwadar Port in Balochistan with China’s Xinjiang province. It is considered a core project of Chinese President Xi Jinping’s Belt and Road Initiative (BRI).

The project has been shelved citing sufficient generation capacity already lined up for the next few years. The previous Pakistan Muslim League-Nawaz (PML-N) government had pushed for the construction of the 1,320 MW Rahim Yar Khan power project by China.

According to reports, the Prime Minister Imran Khan’s government (Pakistan Tehreek-i-Insaf) officially conveyed to Beijing that it was no more interested in the project and requested the Chinese to formally delete the project from the CPEC list.

An official said, a Pakistani delegation led by Minister Makhdoom Khusro Bakhtyar proposed to remove the Rahim Yar Khan imported fuel power plant from the CPEC list in order to provide structure optimisation space for the subsequent power market of Pakistan.

The Chinese side suggested that a joint study on optimisation of energy mix be carried out at the earliest. Cash-strapped Pakistan is negotiating a USD 8 billion bailout package from the the International Monetary Fund (IMF) to overcome a severe balance-of-payments crisis that threatens to cripple the country’s economy.

The project was originally pushed as imported coal-based plant by Quaid-i-Azam Thermal Company of the Punjab government led by PML-N president Shahbaz Sharif who used to attend meetings of the Cabinet Committee on Energy led by his brother and then prime minister Nawaz Sharif.

A leading business tycoon had proposed the project and was expected to be one of the key sponsors. The project was removed from the CPEC priority list when then bureaucracy highlighted that surplus generation capacity had already been contracted and more contracts would lead the country to ‘capacity trap’.

The government had already notified a ban on capacity addition on imported fuel as early as June 2016 and the Rahim Yar Khan and Muzaffargarh coal-based plants were removed from the CPEC priority list, the report said. Among other reasons, this led to unceremonious removal of the then power secretary and head of the National Transmission Company – the system operator.

The Punjab government had pushed for revival of the plant which was included again in the priority list in subsequent CPEC negotiations, according to a federal secretary. It was not needed at all and would have been a burden on the already deteriorating financial condition of the power sector, he said, adding that Diamer-Bhasha dam was also included in the CPEC list when the coal-based projects were removed, but the dam project could also not move forward under the CPEC for unrelated reasons.

The official said the PTI government had already made up its mind to remove almost 400 “politically motivated” projects from the development portfolio as part of a comprehensive mid-year review of the Public Sector Development Programme later this month.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleSIAM: Decline in passenger vehicle sales
Next Article Will devastate Turkey if it hits Kurdish forces: Trump
Add A Comment

Comments are closed.

Latest Posts

Tasmac enforces digital payment above Rs 1,000 in Chennai

NT BureauNovember 23, 20260

The Tamil Nadu State Marketing Corporation (Tasmac) has implemented mandatory digital-only payments for retail liquor purchases exceeding Rs 1,000 across outlets in Chennai and neighbouring Tiruvallur East starting

Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR

PugazhNovember 23, 20260

Industrial and commercial properties require flooring that can withstand daily operational challenges. Manufacturing units, warehouses,…

TVK to present second phase of student educational awards on Nov 26, 27

NT BureauNovember 23, 20260

The Tamilaga Vettri Kazhagam (TVK) will host the second phase of its annual educational awards and financial assistance ceremony for meritorious Class 10 and Class 12 students at a private auditorium in Neelankarai,

Full ‘Beaver Supermoon’ to light up the sky tomorrow night

NT BureauNovember 23, 20260

Skywatchers across Tamil Nadu and India will witness a dazzling celestial spectacle on Tuesday, November 24, when the full ‘Beaver Supermoon’ illuminates the night sky, reaching its peak illumination at 8.23 pm IST.

Kim Jong Un ignores Trump’s multiple attempts to re-establish contact

NT BureauNovember 23, 20260

North Korean leader Kim Jong Un has repeatedly ignored outreach efforts by US President Donald Trump to revive bilateral dialogue, with Pyongyang’s mission at the United Nations even returning a personal letter from

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Tasmac enforces digital payment above Rs 1,000 in Chennai
  • Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR
  • TVK to present second phase of student educational awards on Nov 26, 27
  • Full ‘Beaver Supermoon’ to light up the sky tomorrow night
  • Kim Jong Un ignores Trump’s multiple attempts to re-establish contact
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 4   +   6   =  
Lost password?