Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Thursday, November 5, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Metro rail services to Washermanpet to commence soon after trial run

Metro rail services to Washermanpet to commence soon after trial run

S Ben RajaBy S Ben RajaJanuary 19, 2019No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: “The phase one extension project that links Washermanpet with Tiruvottiyur and Wimco Nagar will be open for public by June 2020. Not only that, all the pending safety works in this last line of phase one between AG-DMS and Washermanpet stations will be completed at the earliest,” said Commissioner of Metro Railway Safety (CMRS) – Bengaluru circle K A Manoharan.

He said this post undertaking the safety inspection of the final line of Chennai Metro Rail Ltd’s (CMRL’s) phase one project connecting AG-DMS and Washermanpet stations today, starting the process from Washermanpet station.

Earlier, he inspected the ventilation facilities, track works, and other parameters. He checked out various facilities at all the eight stations on the stretch including AG-DMS, Thousand Lights, LIC, Government Estate, Chennai Central, High Court, Mannadi and Washermenpet to verify if they are safe for passengers.

“After the safety inspection fully gets over and all the drawbacks sorted out, the opening date of the line for public will be announced which will be most probably in a week,” he added.

The inauguration of this stretch will denote the completion of the Rs 14,600 crore phase one project covering a total of 45 km. With phase one inching towards opening, CMRL has gradually shifted focus to the 9-km phase one extension that links Washermanpet with Wimco Nagar and Thiruvottityur. The contract for the track work has been awarded to Apurvakriti Infrastructure Private Ltd and would take about a year to complete.

Nine stations at Washermanpet, Korukkupet, Sir Theagaraya College, Tondiarpet, Toll Gate, Thangal, Gowri Ashram, Tiruvottiyur and Wimco Nagar, will come up according to the plan. The construction would be complete by December 2019.

CMRL is also ready for its phase two project which will connect Madhavaram with Sholinganallur. This phase is expected to stretch across 108 km and will have 116 stations at a cost of Rs 80,000 crore. The first portion of this phase will span 50 km connecting Madhavaram and Koyambedu CMBT.

What will be scrutinised?
Several civil, operations and system readiness parameters namely OHE height, stagger measurement, demonstration of fire hydrant at ramp area, demonstration of jet fans, ramp sump pump inspection, overview, measurement of schedule of dimensions (SODs), gauge, level, clearance measurement at every 200 m intervals, demonstration of passenger emergency telephone (PET), public announcement (PAP), passenger information displays (PIDS), lifts, escalators, HV room and M05 room among other things will be inspected during the two-day event which will conclude tomorrow.
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleKickboxer from Chennai wins gold in Russia
Next Article Japanese Ikebana exhibition being held in Chennai for two days (video)
Add A Comment

Comments are closed.

Latest Posts

E-paper 5 November 2026

NT BureauNovember 5, 20260

U-19 Asia Cup begins in Muscat

NT BureauNovember 5, 20260

The 13th edition of the Under-19 Junior Asia Cup cricket tournament kicked off in Muscat, Oman, on Thursday, featuring eight regional teams competing across two groups for the continental crown.

Chennai techie dies by suicide

NT BureauNovember 5, 20260

A 37-year-old software engineer, who was reportedly under extreme psychological distress after suffering huge financial losses exceeding Rs 60 lakh in online trading, was found dead in a lodge room in Chengalpattu on

CM inspects new camp office

NT BureauNovember 5, 20260

Chief Minister C. Joseph Vijay on Thursday inspected the newly renovated government bungalow, titled ‘Bamani’, situated within the Pothigai complex on DGS Dinakaran Salai in Raja Annamalaipuram, which is being readied as

Chennai gold rates jump Rs 2,280

NT BureauNovember 5, 20260

Retail gold prices in Chennai witnessed a sharp surge on Thursday, climbing by Rs 2,280 per sovereign to breach the Rs 1.07-lakh milestone ahead of peak Deepavali festive purchases.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 5 November 2026
  • U-19 Asia Cup begins in Muscat
  • Chennai techie dies by suicide
  • CM inspects new camp office
  • Chennai gold rates jump Rs 2,280
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?