Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Tuesday, November 24, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Work on Tambaram rly station subway to be completed soon

Work on Tambaram rly station subway to be completed soon

Balasubramani MuniyandiBy Balasubramani MuniyandiFebruary 17, 2019No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: The construction of a pedestrian subway at the railway track near the Tambaram railway station connecting East and West Tambaram is expected to be completed by this month, following which it will be opened for public use.

The project kickstarted in April 2017 and was scheduled to be completed the same year. However, the work got delayed due to various reasons such as monsoon and soil conditions.

An official said the subway is constructed using the box jacking technology. ‘In this method, concrete boxes are prepared at the construction site and pushed into place using hydraulic power,’ the official added.

The pedestrian subway is constructed near the already existing one for two-wheelers and light motor vehicles.

Estimated to cost Rs 2.8 crore, the subway was developed following several requests by residents to create safe access for pedestrians as the railway level-crossing was closed after the completion of the Rs 78-crore road overbridge in 2011.

Residents said they find it difficult to walk nearly a kilometre and then climb a foot-over-bridge on the premises of the Tambaram railway station. Pedestrians also cross the railway tracks between East and West Tambaram, risking their lives.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous Article17 February, 2019
Next Article Focus on Mandhana as BPXI take on England
Add A Comment

Comments are closed.

Latest Posts

Tasmac enforces digital payment above Rs 1,000 in Chennai

NT BureauNovember 23, 20260

The Tamil Nadu State Marketing Corporation (Tasmac) has implemented mandatory digital-only payments for retail liquor purchases exceeding Rs 1,000 across outlets in Chennai and neighbouring Tiruvallur East starting

Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR

PugazhNovember 23, 20260

Industrial and commercial properties require flooring that can withstand daily operational challenges. Manufacturing units, warehouses,…

TVK to present second phase of student educational awards on Nov 26, 27

NT BureauNovember 23, 20260

The Tamilaga Vettri Kazhagam (TVK) will host the second phase of its annual educational awards and financial assistance ceremony for meritorious Class 10 and Class 12 students at a private auditorium in Neelankarai,

Full ‘Beaver Supermoon’ to light up the sky tomorrow night

NT BureauNovember 23, 20260

Skywatchers across Tamil Nadu and India will witness a dazzling celestial spectacle on Tuesday, November 24, when the full ‘Beaver Supermoon’ illuminates the night sky, reaching its peak illumination at 8.23 pm IST.

Kim Jong Un ignores Trump’s multiple attempts to re-establish contact

NT BureauNovember 23, 20260

North Korean leader Kim Jong Un has repeatedly ignored outreach efforts by US President Donald Trump to revive bilateral dialogue, with Pyongyang’s mission at the United Nations even returning a personal letter from

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Tasmac enforces digital payment above Rs 1,000 in Chennai
  • Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR
  • TVK to present second phase of student educational awards on Nov 26, 27
  • Full ‘Beaver Supermoon’ to light up the sky tomorrow night
  • Kim Jong Un ignores Trump’s multiple attempts to re-establish contact
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 5   +   6   =  
Lost password?