Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Saturday, April 18, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • Tamilnadu Election 2026
  • Puducherry Election 2026
  • Other States Elections 2026
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • IPL 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Damaged electric poles are aplenty at Ambattur

Damaged electric poles are aplenty at Ambattur

Praveen Kumar SBy Praveen Kumar SApril 11, 2019No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

The government has just started the long-standing work of laying underground electric lines to replace the age-old overhead cables. The move is welcome for it will reduce powercuts and add to safety as well.

Currently, authorities are laying high-tension underground cables on Chennai-Tiruvallur High Road (CTH) and Surapet Main Road. The work is being carried on by the local Tangedco division and currently is underway between Ambattur OT bus stand and Telephone Exchange.

“The high-tension cables (230kV) would bring frequent powercuts to an end in the neighbourhood. It has been a long time coming and hopefully it gets over soon,” said Manohar, a resident. While on one hand that work is all the more welcome, residents are quick to point out that the existing electric poles are in the worst possible condition at present.

“I live near Puzhal and it is all overhead cables here. We are afraid to send out children out fearing that the poles might fall down any moment, for they seem to be damaged beyond repair,” said Ravi, a resident.

“Many poles have vines over them, weakening the structure and the concrete withers for a slight touch. It is really bad,” he adds.

Malathi, another resident said, “We welcome the project to lay underground cables. At the same time, we need to face the reality. The project will take some time to get completed. It is only wise that authorities make sure they maintain electric poles that are already present. It is summer and the long mornings can be utilised well.”

Residents want officials to carry out necessary repair works on every pole that is dilapidated before a mishap happens that may even result in life loss.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleRetd DRDO officer from Chennai is multi-faceted
Next Article 2019 polls: Rahul arrives TN to address meetings in 4 constituencies
0 0 votes
Article Rating
Subscribe
Login
Notify of
guest
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Latest Posts

Allahabad HC orders probe, FIR in Rahul dual citizenship row

AgencyApril 18, 20260

New Delhi,  Apr 18: The Allahabad High Court has directed Uttar Pradesh Police to…

Perambur:TVK chief Vijay holds door-to-door campaign 

NT BureauApril 18, 20260

Chennai,  Apr 18: Actor-turned-politician Vijay intensified his election campaign with a direct, grassroots approach by…

LPG shortage leaves Chennai

NT BureauApril 18, 20260

Chennai, Apr 18: A shortage of auto LPG has disrupted transport services in Chennai, leaving…

Labour shortage slows Chennai Metro Phase II work

NT BureauApril 18, 20260

Chennai, Apr 18: Construction work on the Koyambedu–Chennai Trade Centre stretch of Chennai Metro Rail…

Mega Nandavanam Park to transform Chennai’s ECR stretch

NT BureauApril 18, 20260

Chennai, Apr 18: A massive 223-acre Nandavanam Park is set to come up along…

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Allahabad HC orders probe, FIR in Rahul dual citizenship row
  • Perambur:TVK chief Vijay holds door-to-door campaign 
  • LPG shortage leaves Chennai
  • Labour shortage slows Chennai Metro Phase II work
  • Mega Nandavanam Park to transform Chennai’s ECR stretch
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

wpDiscuz
Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 7   +   2   =  
Lost password?