Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Sunday, July 5, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • FIFA 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home Ā» Atomic fuel removed from crippled Fukushima power plant in Japan

Atomic fuel removed from crippled Fukushima power plant in Japan

NT BureauBy NT BureauApril 15, 2019No Comments
🌐 Translate ā–¾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Tokyo:Ā Tokyo Electric Power Co (TEPCO) today began clearing atomic fuel using remote-controlled equipment from inside Fukushima power plant which houses one of the reactors that melted down in 2011.

The operation is deemed delicate and comes four years behind schedule. It also represents the first time the TEPCOĀ has pulled out fuel from inside a highly contaminated building containing the melted-down reactor.

Remote-controlled equipment had to be used since the radiation levels were high and technicians had to haul fuel from a storage pool inside the building.

It has been reported that the process will take two years to remove 566 units of nuclear fuel, most of which are already spent.Ā TEPCO spokeswoman Yuka Matsubara has reportedly stated thatĀ Engineers have had to br contend with clearing earthquake debris inside the building and an array of other technical challenges.

However, until 2021, the TEPCO engineers will not attempt to extract molten nuclear fuel that remains deep inside the reactor as it is considered the most difficult part of the massive clean-up operation.

In February, a remote-controlled probe to pick up pebble-sized pieces of the melted fuel in a bid to find out whether the material could be moved. The next step in that painstaking process will be to remove some of the fuel as a sample, which is scheduled to happen by March 2020. The company also faces other difficult challenges, including working out how to dispose of large quantities of contaminated water stored in containers at the plant site.

In the worst nuclear disaster since Chernobyl in 1986, reactors one, two and three at the Fukushima Daiichi power plant melted down after a deadly earthquake and tsunami that struck Japan in 2011. The tsunami killed around 18,000 people and caused widespread devastation, and the nuclear meltdown forced the evacuation of areas near the plant. Reactors four through six were offline at the time of the disaster for inspections and did not suffer meltdowns, though reactor four was damaged by an explosion in the days after the tsunami.

In December 2014, TEPCO finished removing all 1,535 units of nuclear fuel kept inside the storage pool at reactor four. The company aims to conduct the same operations for the buildings for reactor one and two by 2023 as part of a four-decade plan to dismantle the entire Fukushima plant. Japan’s government has pushed a reconstruction plan for the surrounding region that includes decontaminating affected areas and removing topsoil.

This month, an evacuation order was lifted for part of Okuma, one of two towns where the nuclear plant is located. But regions affected by the disaster have struggled to attract back residents who fled in the wake of the meltdown, with many still concerned about radiation despite government assurances.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleElection flying squad raids hostel owned by TN MLA
Next Article Chennai Spartans to play in Asian Club championship
0 0 votes
Article Rating
Subscribe
Login
Notify of
guest
guest
0 Comments
Oldest
Newest Most Voted
Latest Posts

E-paper 4 July 2026

NT BureauJuly 4, 20260

Atharvaa likely to team up with director HariĀ 

NT BureauJuly 4, 20260

Actor Atharvaa is reportedly set to collaborate with director Hari for his upcoming film, with discussions between the two said to be progressing smoothly. An official announcement is expected soon.
Hari, known for his fast-paced commercial entertainers, was initially planning a project with actor Prashanth, which appears to have been shelved.

Shanmuga Pandian joins hands with director ThiruĀ 

NT BureauJuly 4, 20260

Actor Shanmuga Pandian has officially signed his next project with filmmaker Thiru, marking an exciting new collaboration in Tamil cinema. The project was announced by the makers on July 2 and has already generated interest among fans.

India eyes first win as England gear up for 2nd T20 clash

NT BureauJuly 4, 20260

Shreyas Iyer-led India will be aiming to register their first win of the UK tour when they face England in the second T20I at Old Trafford, Manchester, on Saturday.

Director Thenpathiyan gets emotional at Angeekaram meet

NT BureauJuly 4, 20260

The success celebration of the Tamil film Angeekaram was held in a grand manner, with the cast and crew expressing gratitude for the overwhelming response received from audiences and critics.
Speaking at the event, director Thenpathiyan expressed heartfelt thanks, stating that the support for the film exceeded their expectations. He acknowledged the role of media and audiences in making the film a success and said the appreciation has been deeply encouraging for the entire team.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 4 July 2026
  • Atharvaa likely to team up with director HariĀ 
  • Shanmuga Pandian joins hands with director ThiruĀ 
  • India eyes first win as England gear up for 2nd T20 clash
  • Director Thenpathiyan gets emotional at Angeekaram meet
Ā© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

wpDiscuz
Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 0   +   9   =  
Lost password?