Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Saturday, September 12, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • FIFA 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Taramani junction needs more safety features

Taramani junction needs more safety features

Naomi NBy Naomi NApril 30, 2019No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: Construction of the Velacheri twin flyovers, currently underway at the Vijaya Nagar junction in the neighbourhood, is expected to change the outlook of the locality and ease traffic movement.

Although the work on the Velacheri-Taramani stretch is progressing at a good pace, residents here are unhappy with the way things are taking shape.

Tansi Nagar Welfare Association Secretary M Balakrishnan said, “The Taramani Link Road-Tansi Nagar junction is a crucial location. Vehicles move in five different ways at this spot, and added to that the flyover ends at the entrance of Tansi Nagar. This creates a lot of inconvenience to the people. They should have planned it in such a way that it ends 100 meters before or after the entrance point of the street so that people can pass through under the bridge without much hassle. It has become challenging for water lorries and heavy vehicle to enter into or take a turn from Tansi Nagar.”

Pointing out this reason, the residents allege that the flyover plan is just wrong. “We need to clearly know when the construction would get over. From the pace in which it is being carried out here, it would take two more years to get finished.”

Since five roads converge at the junction, many feel the need for installing a traffic signal and a rubber speed breaker here.
“Even as the work is underway, to avert untoward incidents, a traffic signal is the need of the hour, we can’t wait till the construction work gets done. It is chaotic during peak hours,” complains a resident. Regarding these issues, the Tansi Nagar Welfare Association has written to the authorities concerned.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleResearchers find that world’s oceans are becoming stormier
Next Article No child’s play
Add A Comment
Leave A Reply

Latest Posts

Special checks on omni buses to prevent fare hikes during Vinayagar Chathurthi

NT BureauSeptember 12, 20260

Tamil Nadu authorities have intensified vehicle inspections across the State to prevent omni bus operators from collecting exorbitant fares from passengers during the Vinayagar Chathurthi festival.

Modi holds hands with Putin, Xi in striking photo from BRICS Summit

NT BureauSeptember 12, 20260

Prime Minister Narendra Modi shared a photograph with Chinese President Xi Jinping and Russian President Vladimir Putin during the BRICS Summit in New Delhi.

BRICS joint statement condemns Pahalgam terror attack

NT BureauSeptember 12, 20260

The Pahalgam terror attack has received a special mention in the BRICS New Delhi joint statement, with the grouping condemning terrorism in the strongest terms. India had pushed for a strong reference to the

E-paper 12 September 2026

NT BureauSeptember 12, 20260

TVK MLA V S Babu clinically stable: Hospital

NT BureauSeptember 12, 20260

Tamilaga Vettri Kazhagam (TVK) Kolathur MLA V.S. Babu, who has been undergoing treatment at a private hospital in Chennai for a respiratory ailment, is clinically stable and showing improvement, according to the hospital.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Special checks on omni buses to prevent fare hikes during Vinayagar Chathurthi
  • Modi holds hands with Putin, Xi in striking photo from BRICS Summit
  • BRICS joint statement condemns Pahalgam terror attack
  • E-paper 12 September 2026
  • TVK MLA V S Babu clinically stable: Hospital
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?