Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Thursday, June 11, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • Tamilnadu Election 2026
  • Puducherry Election 2026
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • IPL 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Work for Sky Walk project begins at T Nagar

Work for Sky Walk project begins at T Nagar

G SrinivasanBy G SrinivasanMay 5, 2019No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: Ever since the Smart City project was earmarked for T Nagar by the Chennai Smart City Limited (CSCL), various amenities like parks, pedestrian plaza, multi-level parking facility, vertical gardens, and more, have been announced.

Now, the latest move is the much-awaited Sky Walk Project, that has been taken up.

According to sources, a portion of the compound wall at Railway Border Road near Ranganathan Street was opened to pave way for erecting pillars.

Briefing on this, an official of CSCL, said, “This is a unique facility connecting Mambalam Railway Station on one side with T Nagar bus terminus on the other, through a bridge. As a first step, a portion of the compound wall was grounded to construct a pillar in the area.”

So how long will it take to complete the project? “It will be done in a phased manner, as several pillars need to be erected till it reaches T Nagar bus terminus. After this, the construction of the over-bridge will be taken up,” he said.

Ever since the wall was grounded, there seem to be some difficulty for authorities like Railway Protection Police and the government police, to prevent trespassers who pass through this area to reach the Railway Station quickly.

“The work has been stalled as the election code of conduct had come into force. It will be resumed during the end of May,” she pointed out.

It is to be noted that under the Smart City project, Dr Natesan Park, Jeeva and Sharma parks and few more in T Nagar, were upgraded and well-received by residents.

On the other side, projects like multi-level parking facility and pedestrian plaza are underway in Pondy Bazaar.

When questioned about the slow progress of the plaza, the official stated, “There are a few technical difficulties like cable-fixing. These are being solved one-by-one. On the other hand, work on the parking facility is also underway.”

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleEngland new boy Archer relaxed over World Cup chances
Next Article Under-strength Barca beaten by Celta
0 0 votes
Article Rating
Subscribe
Login
Notify of
guest
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Latest Posts

E-paper 11 June 2026

NT BureauJune 11, 20260

‘Singappenn’ special task force intensifies patrols across city

Balasubramani MuniyandiJune 11, 20260

The ‘Singappenn’ Special Task Force, launched by the Tamil Nadu Chief Minister on June 9 at Egmore’s Rajarathinam Stadium, has begun intensive patrols and awareness drives across Chennai to enhance safety for women and children.

HC orders probe into govt contract irregularities

NT BureauJune 11, 20260

The Madras High Court has directed the Directorate of Vigilance and Anti-Corruption (DVAC) to conduct a detailed investigation into alleged multi-crore irregularities in government infrastructure contracts and to initiate appropriate legal action against those found guilty.

SETC to shift fully to online ticketing for long-distance buses

NT BureauJune 11, 20260

The State Express Transport Corporation (SETC) is planning to introduce a fully online ticketing system for its long-distance buses, eliminating the current practice of issuing tickets directly through conductors based on seat availability.

Heavy rain likely in 15 districts as SW monsoon advances

NT BureauJune 11, 20260

With conditions turning favourable for the advance of the southwest monsoon, heavy rainfall is expected in more than 15 districts of Tamil Nadu over the next three to four days starting Thursday, according to the Regional Meteorological Centre.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 11 June 2026
  • ‘Singappenn’ special task force intensifies patrols across city
  • HC orders probe into govt contract irregularities
  • SETC to shift fully to online ticketing for long-distance buses
  • Heavy rain likely in 15 districts as SW monsoon advances
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

wpDiscuz
Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 1   +   5   =  
Lost password?