Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Saturday, September 12, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • FIFA 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » ‘Set up 5-year policy framework to develop 50GW wind projects’

‘Set up 5-year policy framework to develop 50GW wind projects’

AgencyBy AgencyMay 8, 2019No Comments
🌐 Translate â–Ÿ
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Mumbai: Indian Wind Turbine Manufacturers Association (IWTMA) has urged the government to implement feed-in-tariff (FiT) based bidding for large capacities and set up a five year policy framework to develop 50GW of wind projects and save this struggling industry.

IWTMA in a meeting with the Ministry of new and renewable energy made certain recommendations including waiver of interstate transmission system (ISTS) charges for captive consumers and FiT policy for less than 25 MW for small domestic investors in States, among others.

“The wind energy sector has been reeling under tremendous pressure and struggling with the transition from FiT to reverse bidding with tariff cap regime resulting in to very low tariff. The tariff discovered is so low that it is neither bankable nor sustainable. Due to this, irrespective of bidding of 17GW, actual installation is around 700MW,” chairman, IWTMA, Tulsi Tanti said in a statement.

The recommendations include implementation of FiT and setting up a five years firm policy framework to develop 50GW of wind capacity, which will include National Institute of Wind Energy certified three wind zones.

IWTMA has suggested that the tariffs for each zone for the five years will be fixed by the CERC as per the national tariff policy, which will reduce yearly by five paise. Also, the SECI will have to provide power purchase agreements based on the CERC tariff.

“In last two years, against countrys annual installed manufacturing capacity of 10GW, only 15 percent capacity is utilized. This low capacity utilization is not sustainable by the sector and has severely affected 4,000 SMEs and two million jobs. At this rate, achieving national target of 175Gw by 2022 will be a big challenge,” Tanti said.

He further noted that wind sector with up to 90 per cent localisation is truly ‘Make in India’ and FiT is more suitable for its sustained growth.

‘We need to unlock small and medium size investments at State level and promote export to fully utilize manufacturing capacity and be global hub for manufacturing wind power solutions,’ Tanti added.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleMore than 62,000 students apply for engineering in TN
Next Article CSK coach credits MI with playing nice brand of cricket
Add A Comment
Leave A Reply

Latest Posts

Harish Kalyan unveils ‘Haiku’ teaser; film to release on Oct 23

NT BureauSeptember 12, 20260

The teaser of the upcoming Tamil romantic film Haiku, starring debutant Aegan in the lead, has been released by actor Harish Kalyan. The makers have also announced that the film will hit theatres worldwide on October 23.

Drishyam The Conclusion’ to hit screens on October 2

NT BureauSeptember 12, 20260

The much-awaited final chapter of the popular Drishyam franchise, Drishyam The Conclusion, is set to hit theatres on October 2, 2026.

Sivakarthikeyan’s ‘Seyon’ wraps second shooting schedule

NT BureauSeptember 12, 20260

The second shooting schedule of actor Sivakarthikeyan’s upcoming Tamil film Seyon has been completed, with the makers sharing a behind-the-scenes video offering glimpses of the characters.

Radikaa Sarathkumar meets Ajith Kumar in London, calls him a great inspiration

NT BureauSeptember 12, 20260

Veteran actress Radikaa Sarathkumar recently met actor Ajith Kumar in London and shared pictures and a video from the meeting on social media.

Jitin Gulati praises Prabhas’ generosity’

NT BureauSeptember 12, 20260

Actor Jitin Gulati, who has been working with Prabhas on the upcoming film Fauzi for nearly two years, says his experience with the superstar has only strengthened his reputation as a generous and kind-hearted person.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Harish Kalyan unveils ‘Haiku’ teaser; film to release on Oct 23
  • Drishyam The Conclusion’ to hit screens on October 2
  • Sivakarthikeyan’s ‘Seyon’ wraps second shooting schedule
  • Radikaa Sarathkumar meets Ajith Kumar in London, calls him a great inspiration
  • Jitin Gulati praises Prabhas’ generosity’
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?