Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Monday, November 30, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Chennai Railway Division constructs bridge ahead of deadline

Chennai Railway Division constructs bridge ahead of deadline

NT BureauBy NT BureauJune 24, 2019No Comments
🌐 Translate â–Ÿ
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: The Chennai Railway Division completed a major bridge work in the Chennai Beach- Villupuram section between Guduvanchery and Vandalur.

According to Southern Railway, a breach occurred at this location following heavy rains in December 2015.

Subsequently, the railway decided to construct two additional minor bridges and one major bridge at this place. The work was sanctioned in 2017-18 at an approximate cost of Rs 2.3 crore.

While the two minor bridges were completed last year, the major bridge work was completed an hour ahead of the 14 hour Line Block/Power Block permitted for the construction 23 June. To finish the construction of the bridge, 12 precast reinforced concrete cement boxes of clear size 9.15 x 2.65 metres – of length 1.5 m and weighing 70 tonnes each – were placed with the help of a crawler type crane.

A press release said, considering the repercussion to passenger train traffic, the work was planned on two weekends with night blocks to reduce passenger inconvenience.

Making use of this block period, workers installed a temporary girder for a subway at the section. Also, at a level crossing between Chengalpattu and Ottivakkam in Chennai Egmore-Villupuram section, temporary girders were erected for subway work.

At Chennai Egmore, supporting braces for foot over bridge was done. The press release further noted that in Chennai Egmore-Villupuram section, 3,700 metres of track between Vandalur and Guduvanchery was detressed and six rail joints were welded. Tie tamping of track and ballast cleaning was also undertaken in the section between Guduvanchery and Kattankulatur stations. Attention to various track conditions including water stagnation prone places and greasing was done in the section.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleThomas Cook (India) Ltd launches Travolution
Next Article Flipkart co-founder Binny Bansal sells shares for Rs 531 crores
Add A Comment

Comments are closed.

Latest Posts

President Murmu begins three-day visit to Mizoram

NT BureauNovember 30, 20260

President Droupadi Murmu is on an official three-day visit to Mizoram as part of her ongoing six-day tour of southern and northeastern states.

Sindarov beats Gukesh in Game 5 to take World Championship lead

NT BureauNovember 30, 20260

Uzbek challenger Javokhir Sindarov drew first blood in the 2026 FIDE World Chess Championship, defeating defending champion Gukesh Dommaraju of India in Game 5 in Geneva on Sunday to take a 3.0–2.0 lead in the 14-game title match.

Akash Deep ruled out of Christchurch Test with concussion

NT BureauNovember 30, 20260

India suffered a major injury setback in the second Test against New Zealand at Hagley Oval in Christchurch after first-innings five-wicket hero Akash Deep was ruled out of the remainder of the match with a concussion on Day 3.

Centre to table Delimitation, Women’s Quota Bills today

NT BureauNovember 30, 20260

The Union government is set to introduce the Constitution (132nd Amendment) Bill, 2026, along with the Delimitation (Second) Bill, 2026, and the Union Territories Laws (Amendment) Second Bill, 2026, in the Lok Sabha on Monday, November 30, as Parliament convenes for a crucial Special Session.

DMK president Stalin stands firm on Delimitation Bill after INDIA bloc talks

NT BureauNovember 30, 20260

Former Tamil Nadu Chief Minister and DMK president M.K. Stalin has refused to reconsider his party’s decision to support the Union government’s 132nd Constitutional Amendment Bill on parliamentary delimitation, despite a high-level delegation of INDIA bloc leaders—including Sonia Gandhi, Rahul Gandhi, and Mallikarjun Kharge—meeting him in Chennai on Sunday.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • President Murmu begins three-day visit to Mizoram
  • Sindarov beats Gukesh in Game 5 to take World Championship lead
  • Akash Deep ruled out of Christchurch Test with concussion
  • Centre to table Delimitation, Women’s Quota Bills today
  • DMK president Stalin stands firm on Delimitation Bill after INDIA bloc talks
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 10   +   5   =  
Lost password?