Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Wednesday, November 11, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » What went wrong with ISRO mission – GSLV-F10-EOS-03

What went wrong with ISRO mission – GSLV-F10-EOS-03

NT BureauBy NT BureauAugust 13, 2021No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Sriharikota: The Indian Space Research Organisation (ISRO) could not acomplish GSLV-F10/EOS-03 mission as the upper cyrogenic stage failed to ignite, about five minutes after lift off from the Satish Dhawan Space Centre on Thursday.

Sources said ater a smooth 26-hour countdown. the 57.10 m tall GSLV-F10, wighing 416 ton, carrying the 2,268 kg agile Earth Observation Satellite (ES-03) took off as scheduled at
5.43 am from the Second Launch Pad at the SHAR Range.

The performance of the first and second stages of the three stage vehicle were normal. However the third stage–Cryogenic Upper Stage–ignition did not take place due to a technical anomaly and the satellite could not be placed in the intended Geostationary Orbit.

The ignition of the cyro stage should have happened about five minutes after the lift-off.
Addressing the scientists ISRO Chairman K Sivan said that a “technical anomaly was observed in the cryogenic stage and the mission could not be accomplished.”

ISRO in an update said, “GSLV-F10 launch took place at 0543 hrs as scheduled. Performance of first and second stages was normal. However, Cryogenic Upper Stage ignition did not happen due to technical anomaly. The mission couldn’t be accomplished as intended.”

GSLV-F10 is a three stage launch vehicle with the solid and liquid fuels in the first two stages respectiely. The third is the cryogenic stage.

The aim of the mission was to place EOS-03 in Geostationary orbit. The satellite was expected to provide near real-time imaging of large area of interest at frequent intervals, which could be used for quick monitoring of natural disasters, episodic events and any short-term event.

This failure is all the more surprising because the rocket launches since 2017 have been successful, and this failure breaks a long streak of successful launches.

Right from the beginning the GSLV-F10 mission appeared to be a jinxed one for ISRO in its bid to place its first Geo-Imaging Satellite-1 (GISAT-1) or Earth Observation Satellite-03 (EOS-03) in the Orbit.

Originally the GISAT-1 was slated for launch on March five last year. However, it was postponed at the last minute due to a technical glitch.

Soon after this, the Covid-19 pandemic broke out and the subsequent lockdown delayed the mission. Due to the delay, the rocket had to be dismantled and cleaned up.

Subsequently, the GISAT-1 launch was slated for March this year, but due to problems in the satellite’s battery side, the flight once again got delayed.

With the replacement of the battery the satellite and the rocket was readied for the mission when the second Covid wave led to further delay.

When ISRO finally took up the mission, it surprisingly failed as the third stage fails to get ignited and the satellite could not be placed in the geosationary orbit.

Can be rescheduled again: Jitendra Singh

Hours after ISRO’s GSLV-F10 failed to place the agile earth observation satellite EOS-03 into the Geostatioary orbit due to non-ignition of the cryogenic stage, Union Minister of State in PMO and in-charge of Department of Space Jitendra Singh said the mission can be rescheduled some time again.

In a tweet after the failure of the GSLV-F10/EOS-03 mission about five minutes after lift off from the Second Launch Pad the SHAR Range, Singh said he held detailed discussion with ISRO Chairman Dr K Sivan about the mission.

 

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleTamilnadu Budget today
Next Article Police serve notice to Shilpa Shetty
Add A Comment

Comments are closed.

Latest Posts

E-paper 10 November 2026

M BHARAT KUMARNovember 10, 20260

Banks shut in 5 states tomorrow for regional festivals

NT BureauNovember 10, 20260

Public and private bank branches will remain closed across five states on Wednesday, November 11, on account of regional festive holidays, according to the Reserve Bank of India (RBI) holiday roster.

Pawan Kalyan, Anna Konidala announce separation

NT BureauNovember 10, 20260

Andhra Pradesh Deputy Chief Minister and Jana Sena Party chief Pawan Kalyan and his wife Anna Konidala have announced their separation after 13 years of marriage.

Northeast monsoon gains momentum

NT BureauNovember 10, 20260

The northeast monsoon has intensified across Tamil Nadu, with the Regional Meteorological Centre (RMC) forecasting widespread downpours and warning that a low-pressure area over the Bay of Bengal could develop

Seven wild elephants die in Nilgiris within 25 days

NT BureauNovember 10, 20260

The death of a 22-year-old male wild elephant in the Masinagudi division on Monday has brought the total jumbo mortality toll in the Nilgiris district to seven within a span of 25 days, raising deep concerns among wildlife

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 10 November 2026
  • Banks shut in 5 states tomorrow for regional festivals
  • Pawan Kalyan, Anna Konidala announce separation
  • Northeast monsoon gains momentum
  • Seven wild elephants die in Nilgiris within 25 days
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?