Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Sunday, July 26, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • FIFA 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Major milestone for ISRO
CHENNAI

Major milestone for ISRO

NT BureauBy NT BureauMay 14, 2022No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai : Marking a major achievement, the Indian Space Research Organisation (ISRO) today successfully completed the static test of a human-rated solid rocket booster (HS200) for the Gaganyaan Programme at the Satish      Dhawan Space Centre (SDSC), Sriharikota.

The HS200 booster loaded with 203 tons of solid propellant was tested for a duration of 135 seconds. The 20 m long and 3.2 m diameter booster is the world’s second-largest operational booster with solid propellant.

During this test, about 700 parameters were monitored and the performance of all the systems was normal. With the successful completion of this test, ISRO marches one more step closer to Gaganyaan Programme.

Out of the three propulsion stages of LVM3, the human-rated versions of the second stage known as L110-G loaded with liquid propellant and the third stage C25-G with cryogenic propellant are in the final phase of qualification including tests with static firing.

Gaganyaan programme, the most prestigious scientific endeavour of India is steadily progressing towards its final goal of taking an Indian to space and bringing him safely back.

HS200 rocket booster is the human-rated version of the well-proven S200 rocket booster of GSLV Mk-III satellite launch vehicle, popularly known as LVM3.

The successful completion of this test marks a major milestone for the prestigious human space flight mission of ISRO, the Gaganyaan, as the first stage of the launch vehicle is tested for its performance for the full duration.

The event was witnessed by ISRO Chairman S Somanath and Vikram Sarabhai Space Centre (VSSC) Director Dr. S Unnikrishnan Nair along with other ISRO scientists.

The design and development of the HS200 booster were completed the VSSC, Thiruvananthapuram and propellant casting was completed at the spaceport of Sriharikota, about 100 km from here.

The S200 motor which is the first stage of the LVM3 launch vehicle intended for launching a 4,000 kg class of satellites to Geosynchronous Transfer Orbit, was configured as a strap-on rocket booster.

Based on the successful launch pedigree of this launch vehicle, including the

Chandrayaan mission, the LVM3 has been identified as the launcher for the Gaganyaan mission.

For the manned space mission, LVM3 launch vehicle underwent improvements stipulated by the requirements of human rating. Accordingly, a host of design improvements that were aimed at increasing the safety and reliability of various systems were implemented in the S200 booster like all other systems.

These include additional safety features for motor case joints and robust insulation and ignition systems. The control system used in this booster employs one of the world’s most powerful electro-mechanical actuators with multiple redundancies and safety features.

The system is fully indigenously designed and developed by ISRO in participation with various industries spread across the country.

Despite the restrictions imposed by the pandemic, ISRO could complete the entire design, development, realization and testing process within a short span of two years.

Major milestone for ISRO
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleChild rights crisis
Next Article Contributors to Asthma burden in India revealed

Related Posts

TAMIL NADU

Land acquisition cleared for Mannargudi–Pattukkottai rail project

July 25, 2026
TAMIL NADU

Temple officials issued strict governance guidelines

July 25, 2026
TAMIL NADU

TASMAC tightens rules on overpricing

July 25, 2026
TAMIL NADU

Ramadoss announces political retirement on 88th birthday

July 25, 2026
TAMIL NADU

Tasmac Tightens Rules on Overpricing, Repeat Offenders Face Dismissal

July 25, 2026
CHENNAI

Apply for Patta transfers only via e-Sevai, Says TN govt

July 25, 2026
Add A Comment

Comments are closed.

Latest Posts

Pradhan resigns amid massive student protests over NEET leak fiasco

NT BureauJuly 25, 20260

Union Education Minister Dharmendra Pradhan resigned on Saturday following massive nationwide protests over the

E-paper 25 July 2026

NT BureauJuly 25, 20260

Land acquisition cleared for Mannargudi–Pattukkottai rail project

NT BureauJuly 25, 20260

The TVK-led coalition government has granted administrative sanction for land acquisition for the long-pending Mannargudi–Pattukkottai broad gauge railway line, marking a major step towards improving connectivity in Thanjavur district.

Temple officials issued strict governance guidelines

NT BureauJuly 25, 20260

The Hindu Religious and Charitable Endowments Department has issued a comprehensive set of instructions to temple officials, emphasising transparency, accountability, and improved services for devotees.

TASMAC tightens rules on overpricing

NT BureauJuly 25, 20260

The Tamil Nadu State Marketing Corporation has introduced stricter disciplinary measures to curb the sale of liquor above the maximum retail price (MRP), warning employees of suspension, transfer, and even dismissal for repeated violations.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Pradhan resigns amid massive student protests over NEET leak fiasco
  • E-paper 25 July 2026
  • Land acquisition cleared for Mannargudi–Pattukkottai rail project
  • Temple officials issued strict governance guidelines
  • TASMAC tightens rules on overpricing
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 10   +   6   =  
Lost password?