Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Monday, November 23, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » CMRL Phase II: Porur–Power House viaduct nears completion
CHENNAI

CMRL Phase II: Porur–Power House viaduct nears completion

NT BureauBy NT BureauAugust 11, 2025No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
The Chennai Metro Rail Limited (CMRL) is on track to finish the viaduct and double-decker section along Arcot Road between Porur and Power House for the Phase II project by the end of September.
The work is part of Corridor 4, a 26.1 km line from Light House to Poonamallee. The Porur–Power House section includes a 3.75 km double-decker stretch between Alwarthirunagar and Alapakkam, which will connect to the Phase I network at Vadapalani. This link will enable seamless transfers between Corridor 4 and Corridor 5 at Alwarthirunagar, Valasaravakkam, Karambakkam, and Alapakkam.
According to CMRL officials, 95% of the 340 piers in this section have been completed. The project, however, faced a six-month delay due to challenges such as working in congested localities, the need for special launching girders, and the relocation of underground pipelines and cables.
While most of the viaduct is already in place, construction work near Valasaravakkam, Alwarthirunagar, and Vadapalani is expected to be completed within the next two months. Track-laying and installation of overhead equipment (OHE) are progressing at Vadapalani, Saligramam, Karambakkam, and Alapakkam, with completion expected in about four months.
The first level of the double-decker stretch is scheduled to open by mid-2026. The second level will begin operations once a portion of Corridor 5 is ready, promising better connectivity and shorter travel times for commuters across the city.
CMRL Phase II: Porur–Power House viaduct nears completion
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleFlight carrying MPs makes emergency landing in Chennai
Next Article Ungaludan Stalin special camp in Chennai

Related Posts

CHENNAI

Metro water supply to be suspended  in four zones for 24 hours on 25 Nov

November 23, 2026
CHENNAI

Five-hour power cut in parts of Chennai from 10 am

November 23, 2026
CHENNAI

Heavy rain alert for 10 TN districts, Puducherry

November 23, 2026
CHENNAI

Tasmac enforces digital payment above Rs 1,000 in Chennai

November 23, 2026
CHENNAI

Full ‘Beaver Supermoon’ to light up the sky tomorrow night

November 23, 2026
CHENNAI

GCC plans sponge  parks across Chennai

November 21, 2026
Add A Comment

Comments are closed.

Latest Posts

‘Death Railway’ set against WWII backdrop

NT BureauNovember 23, 20260

Following his critically acclaimed debut Yaathisai, director Dharani Rasendran has helmed Death Railway, a commercial drama set during the height of World War II.

‘Scroll’ selected for Goa film festival

NT BureauNovember 23, 20260

Produced by K16 Studios and directed by Kannan of Password fame, the Tamil film Scroll has been officially selected for screening in the Indian Panorama section at the 57th International Film Festival of India (IFFI) in

Sathyavan Savithri review: Engaging courtroom drama

NT BureauNovember 23, 20260

​Savithri (Keerthy Suresh), a sharp and ambitious young woman determined to establish herself as a leading lawyer, sees her career plans take an unexpected turn when her parents hurriedly arrange her marriage to

Iniya headlines women-centric drama ‘Vanni’

NT BureauNovember 23, 20260

Produced, written, and directed by S.A. Karthikeyan under the banners of Chellammal Movie Makers and Sukkiran Talkies, Vanni is an upcoming Tamil film centred on women’s rights and land rights.

Director shares insights on ‘Pizza Boys’

NT BureauNovember 23, 20260

Produced by Seven Hills Cine Creation, the upcoming Tamil film Pizza Boys has its story, direction, and music handled by Sekar Kesav Sirin, with cinematography by Guruprasad.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • ‘Death Railway’ set against WWII backdrop
  • ‘Scroll’ selected for Goa film festival
  • Sathyavan Savithri review: Engaging courtroom drama
  • Iniya headlines women-centric drama ‘Vanni’
  • Director shares insights on ‘Pizza Boys’
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 4   +   9   =  
Lost password?