Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Monday, November 23, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Teynampet-Saidapet flyover work to resume above Metro stations
CHENNAI

Teynampet-Saidapet flyover work to resume above Metro stations

 Construction of the 3.2-km Teynampet-Saidapet elevated corridor is set to resume over the Teynampet and Nandanam Metro stations after Chennai Metro Rail Limited (CMRL) cleared a revised design for the challenging stretch.
NT BureauBy NT BureauOctober 6, 2026No Comments
🌐 Translate â–Ÿ
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
Chennai, Oct 6:
 Construction of the 3.2-km Teynampet-Saidapet elevated corridor is set to resume over the Teynampet and Nandanam Metro stations after Chennai Metro Rail Limited (CMRL) cleared a revised design for the challenging stretch.
The work along Anna Salai had been stalled for several months over concerns regarding construction above the operational underground Metro stations. A Japanese consultant reviewed the design and recommended installing portal frames along a 300-metre stretch above the two stations at 15-metre intervals.
CMRL has now approved the revised plan, allowing the State Highways Department to proceed with the construction. About 2.3 km of the corridor has already been completed, with 50 of the proposed 69 piers erected.
The project runs for about 2.4 km above the Metro tunnel, including a 460-metre stretch directly over the Teynampet and Nandanam stations. The Metro tunnel is around 14-15 metres below Anna Salai, while the flyover foundations have been drilled only to about seven metres to avoid affecting the Metro infrastructure.
The Rs 621-crore project is expected to be completed by March 2027. Officials said installation of the portal frames alone could take three to four months.
Teynampet-Saidapet flyover work to resume above Metro stations
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleTVK government stabbed nurses in the back, Stalin alleges
Next Article Chennai bypass project remains stalled over CRZ clearance

Related Posts

CHENNAI

Kasimedu fishermen return to sea

November 23, 2026
CHENNAI

Metro water supply to be suspended  in four zones for 24 hours on 25 Nov

November 23, 2026
CHENNAI

Five-hour power cut in parts of Chennai from 10 am

November 23, 2026
CHENNAI

Heavy rain alert for 10 TN districts, Puducherry

November 23, 2026
CHENNAI

Tasmac enforces digital payment above Rs 1,000 in Chennai

November 23, 2026
CHENNAI

Full ‘Beaver Supermoon’ to light up the sky tomorrow night

November 23, 2026
Add A Comment

Comments are closed.

Latest Posts

Tasmac enforces digital payment above Rs 1,000 in Chennai

NT BureauNovember 23, 20260

The Tamil Nadu State Marketing Corporation (Tasmac) has implemented mandatory digital-only payments for retail liquor purchases exceeding Rs 1,000 across outlets in Chennai and neighbouring Tiruvallur East starting

Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR

PugazhNovember 23, 20260

Industrial and commercial properties require flooring that can withstand daily operational challenges. Manufacturing units, warehouses,…

TVK to present second phase of student educational awards on Nov 26, 27

NT BureauNovember 23, 20260

The Tamilaga Vettri Kazhagam (TVK) will host the second phase of its annual educational awards and financial assistance ceremony for meritorious Class 10 and Class 12 students at a private auditorium in Neelankarai,

Full ‘Beaver Supermoon’ to light up the sky tomorrow night

NT BureauNovember 23, 20260

Skywatchers across Tamil Nadu and India will witness a dazzling celestial spectacle on Tuesday, November 24, when the full ‘Beaver Supermoon’ illuminates the night sky, reaching its peak illumination at 8.23 pm IST.

Kim Jong Un ignores Trump’s multiple attempts to re-establish contact

NT BureauNovember 23, 20260

North Korean leader Kim Jong Un has repeatedly ignored outreach efforts by US President Donald Trump to revive bilateral dialogue, with Pyongyang’s mission at the United Nations even returning a personal letter from

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Tasmac enforces digital payment above Rs 1,000 in Chennai
  • Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR
  • TVK to present second phase of student educational awards on Nov 26, 27
  • Full ‘Beaver Supermoon’ to light up the sky tomorrow night
  • Kim Jong Un ignores Trump’s multiple attempts to re-establish contact
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 9   +   3   =  
Lost password?