Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Monday, November 9, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Countdown starts for PSLV-C51

Countdown starts for PSLV-C51

NT BureauBy NT BureauFebruary 26, 2021No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: In its first mission this year and the first dedicated commercial mission for the newly formed NewSpace India Limited (NSIL), PSLV-C51 will launch the 637 kg Brazilian satellite Amazonia-1 and 18-co-passenger satellites from the SDSC SHAR Rage, Sriharikota, on 28 February.

The launch will take place at 1024 hrs from the First Launch Pad. ISRO sources said the launch rehearsal of PSLV-C51 was completed.

Prime Minister Narendra Modi’s engraved picture on a co-passenger satellite and sending Bhagavad Gita on-board in electronic format are some of the notable aspects in the launch.

After the Launch Authorisation Board cleared the mission, the countdown for the launch would begin on Saturday during which propellant filling operations would be taken up in the 44.4 m tall four-stage vehicle.

In this mission, the fourth stage engine would be cut off and restarted twice. The entire mission would last for about two hours.

About 17 minutes after the launch, the fourth stage engine would be cut off following which Amazonia-1 would get separated.

About 44 minutes later, the fourth stage engine would be restarted and cut off after nine seconds, before restarting it for the second time 30 minutes later when the co-passenger satellites would get separated and injected into the Polar Sun Synchronous Orbit.

ISRO would be using the ‘DL’ variant of PSLV equipped with two solid strap-on boosters for this mission.

This would be the first launch of 2021, 39th from the First Launch Pad, 78th Launch Vehicle Mission from SDSC SHAR, 53rd flight of PSLV, third flight of PSLV-DL and the first ‘dedicated PSLV commercial mission for NSIL being undertaken under a commercial agreement the Spaceflight Ic. USA.

Amazonia-1 is the optical earth observation satellite of National Institute for Space Research (INPE), Brazil.

This is the first satellite which is completely designed, integrated, tested and operated by INPE. It has a life span of four years.

The Amazonia-1 mission would further strengthen the existing structure by providing remote sensing data to users for monitoring, deforestation in the Amazon region and analysis of diversified agriculture across the Brazilian territory.

The Indian co-passenger satellites are Satish Dhawan SAT (SDSAT) and UNITYsat.

The commercial co-passengers satellites are India’s SindhuNetra and SAI-1 NanoConnect-2 of USA–both for technology demonstration –and 12 Space BEEs satellites from USA for two-way satellite communications and data relay.

 

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleVeteran CPI leader D Pandian on life support
Next Article India’s wealthiest club to double in next five years: Report
Add A Comment

Comments are closed.

Latest Posts

E-paper 7 November 2026

Sudhakar RNovember 7, 20260

Chennai gold up Rs 160; silver reaches Rs 250/g

NT BureauNovember 7, 20260

Gold prices in Chennai edged higher by Rs 160 per sovereign on Saturday, driven by renewed retail interest and festive bullion demand.

TN extends crop loan waiver up to Rs 75,000 for 13.25L farmers

NT BureauNovember 7, 20260

The Tamil Nadu government has extended its crop loan waiver of up to Rs 75,000 to all eligible agricultural borrowers who availed credit from cooperative societies between May 1, 2025, and March 31, 2026, removing

TN launches Rs 2,000 cr Vetri laptop scheme

NT BureauNovember 7, 20260

Tamil Nadu Chief Minister C. Joseph Vijay has issued administrative sanction to implement the ‘Vetri Laptop Scheme’ at an outlay of Rs 2,000 crore for the 2026–27 academic year, benefiting students across government

Trump celebrates Diwali at White House

AgencyNovember 7, 20260

US President Donald Trump celebrated Diwali at the White House on Friday, joining prominent members of the Indian-American community to mark the Festival of Lights in the Oval Office.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 7 November 2026
  • Chennai gold up Rs 160; silver reaches Rs 250/g
  • TN extends crop loan waiver up to Rs 75,000 for 13.25L farmers
  • TN launches Rs 2,000 cr Vetri laptop scheme
  • Trump celebrates Diwali at White House
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?