Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Wednesday, October 7, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home Ā» CMRL gears up for phase II viaduct construction at Kathipara Junction
CHENNAI

CMRL gears up for phase II viaduct construction at Kathipara Junction

NT BureauBy NT BureauApril 23, 2024No Comments
🌐 Translate ā–¾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

The bustling Kathipara Junction in Chennai is on the brink of a significant transformation as the Chennai Metro Rail Limited (CMRL) gears up to commence construction on the Phase II viaduct. This phase of the ambitious metro project aims to seamlessly integrate the new network with the existing Phase I system, presenting a host of challenges to ensure safety and operational efficiency.
With necessary clearances secured from regulatory authorities such as the Commissioner of Railway Safety and the Airports Authority of India (AAI), CMRL is poised to embark on construction activities. One of the critical aspects guiding construction efforts is the adherence to strict height restrictions, particularly due to the proximity of the Phase II viaduct to existing structures and the flight path of the airport. These measures are crucial to prevent any interference and ensure the safety of both commuters and aircraft.
Approval has also been obtained for construction adjacent to the Phase I viaduct, with work strategically scheduled during off-peak hours to minimize disruptions to passenger services. Once completed, this phase of the project promises to enhance connectivity between various parts of the city, facilitating smoother and more efficient travel for residents and commuters alike.
In tandem with the development at Kathipara Junction, progress is being made on other corridors of the Phase II network. Notably, corridor 4 (Light House to Poonamallee) and corridor 3 (Madhavaram to SIPCOT via Thirumayilai) are also witnessing significant advancements.
The bustling Kathipara Junction in Chennai is on the brink of a significant transformation as the Chennai Metro Rail Limited (CMRL) gears up to commence construction on the Phase II viaduct.
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleChennai braces for heatwave much before Kathiri Veyyil
Next Article Chennai Traffic Police intensifies efforts to combat wrong-side driving

Related Posts

CHENNAI

New designs add colour to Chennai’s Navaratri kolu doll shopping

October 7, 2026
CHENNAI

Fever cases continue among children in Chennai as dengue surveillance remains high

October 7, 2026
CHENNAI

Chennai Corporation collects 44.52 tonnes of old household waste in one day

October 7, 2026
CHENNAI

Illegal bike races: Chennai traffic police seize over 2,000 two-wheelers in three-day crackdown

October 7, 2026
CHENNAI

Poonamallee–Vadapalani Metro to run every 10 minutes

October 7, 2026
CHENNAI

Chennai coaching centres brace for rush after Group 4 notification

October 7, 2026
Add A Comment

Comments are closed.

Latest Posts

Pushpavanam Kuppusamy appointed Eyal Isai Nataka Manram chief

NT BureauOctober 7, 20260

Chennai, Oct 7: Popular Tamil folk singer Pushpavanam Kuppusamy has been appointed president of the…

Sathyabama denies Rs 31 cr poll-spend claim

NT BureauOctober 7, 20260

Dharapuram by-election candidate and Tamilaga Vettri Kazhagam (TVK) leader P Sathyabama has denied a viral video purportedly showing her claiming that she had spent Rs 31 crore during the previous Assembly election, alleging that the video was fabricated using artificial intelligence and circulated with political motives.

EVMs secured ahead of Oct 9 counting in Madurantakam, Dharapuram

NT BureauOctober 7, 20260

With polling for the Madurantakam and Dharapuram Assembly by-elections ending on Tuesday evening, election authorities have shifted their focus to the safe custody of electronic voting machines and preparations for counting on October 9.

New designs add colour to Chennai’s Navaratri kolu doll shopping

NT BureauOctober 7, 20260

With Navaratri just days away, kolu doll sales have picked up across Chennai, with traditional shopping hubs such as Mylapore and Nanganallur drawing families looking to add new pieces to their collections.

Fever cases continue among children in Chennai as dengue surveillance remains high

NT BureauOctober 7, 20260

Fever cases among children continue to be reported in Chennai, with hospitals witnessing increased paediatric consultations for viral fever, respiratory infections and dengue as the city moves towards the northeast monsoon.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Pushpavanam Kuppusamy appointed Eyal Isai Nataka Manram chief
  • Sathyabama denies Rs 31 cr poll-spend claim
  • EVMs secured ahead of Oct 9 counting in Madurantakam, Dharapuram
  • New designs add colour to Chennai’s Navaratri kolu doll shopping
  • Fever cases continue among children in Chennai as dengue surveillance remains high
Ā© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?