Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Thursday, November 26, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » CMRL initiates tunneling operations in Royapettah 
CHENNAI

CMRL initiates tunneling operations in Royapettah 

NT BureauBy NT BureauJuly 23, 2024No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
Chennai Metro Rail Limited (CMRL) has commenced tunneling operations in Royapettah, marking a significant milestone in the Phase II project of Chennai Metro Rail. The tunnel boring machine (TBM) ‘Bhavani’ has begun its journey towards R.K. Salai, representing a crucial step in the development of this expansive infrastructure project.
The Phase II project includes the construction of an underground station at Royapettah, which is part of Corridor 3, stretching from Madhavaram to SIPCOT. This station is being developed at a cost of ₹250 crore and will be situated at a depth of 21.5 meters. The station will cover an area of 150 meters in length and 22 meters in width, facilitating the flow of passengers through this key transit point.
From the Royapettah site, four TBMs will be launched, with two heading towards R.K. Salai and two towards Thousand Lights. TBM ‘Bhavani’ is expected to cover the 910-meter stretch to R.K. Salai in approximately seven months, navigating through a mixture of clay and weathered rock. Another TBM is scheduled to start its journey towards R.K. Salai in the coming weeks.
Corridor 3 is primarily an underground network that will connect important areas such as Madhavaram, Ayanavaram, Purasawalkam, Nungambakkam, Thousand Lights, Royapettah, and Adyar. This corridor is anticipated to become fully operational within four years. At the Adyar site, TBMs that commenced from Greenways Road are making their way towards the Adyar Metro station, although progress has been slower due to challenging rock formations.
In addition to the work on Corridor 3, the Phase II Project also involves the development of the Alapakkam Metro station, which is part of Corridor 4, linking Light House to Poonamallee. This section includes a double-decker construction over a 3.75 km stretch, encompassing stations at Alwarthirunagar, Valasarawakkam, Karambakkam, and Alapakkam.
Moreover, the Poonamallee Depot, being constructed at a cost of ₹187 crore, will serve as a repair and maintenance hub for 56 six-coach driverless trains. This depot is a critical component of the project, ensuring the smooth operation and upkeep of the metro fleet.
The ongoing work on Chennai Metro Rail’s Phase II project underscores CMRL’s commitment to enhancing urban mobility and connectivity in Chennai.
CMRL initiates tunneling operations in Royapettah
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleNine Engg colleges affiliated with Anna varsity to be shut
Next Article Antyodaya Express cancelled for 10 days

Related Posts

CHENNAI

Chennai Metro completes girder  work from Koyambedu to Alandur

November 25, 2026
CHENNAI

Curtains come down on Pilot Theatre 

November 25, 2026
CHENNAI

L&T bags Rs 5,000-cr AI cluster order

November 24, 2026
CHENNAI

Heavy rain alert for Chennai today

November 24, 2026
CHENNAI

Kasimedu fishermen return to sea

November 23, 2026
CHENNAI

Metro water supply to be suspended  in four zones for 24 hours on 25 Nov

November 23, 2026
Add A Comment

Comments are closed.

Latest Posts

Modi and German Chancellor Merz discuss trade, defence

AgencyNovember 25, 20260

New Delhi, Nov 25: Prime Minister Narendra Modi and German Chancellor Friedrich Merz have reaffirmed…

Houthi attack in Riyadh injures 2 Indians; 11 hurt

AgencyNovember 25, 20260

Dubai, Nov 25: Two Indian nationals were among 11 people injured after Yemen’s Houthi…

Huawei found guilty in US trade secrets case

AgencyNovember 25, 20260

New York, Nov 25: Chinese telecommunications giant Huawei Technologies has been found guilty by a…

India calls for human oversight as AI reshapes modern warfare

AgencyNovember 25, 20260

New Delhi, Nov 25: India has urged the United Nations Security Council (UNSC) to establish…

Chennai Watch Days held at Palladium

AgencyNovember 25, 20260

Chennai, Nov 25: Phoenix Marketcity Chennai, through its luxury destination Palladium, hosted the inaugural Chennai…

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Modi and German Chancellor Merz discuss trade, defence
  • Houthi attack in Riyadh injures 2 Indians; 11 hurt
  • Huawei found guilty in US trade secrets case
  • India calls for human oversight as AI reshapes modern warfare
  • Chennai Watch Days held at Palladium
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 3   +   2   =  
Lost password?