Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Saturday, May 30, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • Tamilnadu Election 2026
  • Puducherry Election 2026
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • IPL 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Bengaluru–Chennai Expressway to be fully operational by 2027
CHENNAI

Bengaluru–Chennai Expressway to be fully operational by 2027

The 263.5-km Bengaluru–Chennai Expressway, which passes through Karnataka, Andhra Pradesh and Tamil Nadu, is now expected to become fully operational only by early 2027.
NT BureauBy NT BureauFebruary 24, 2026No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
The 263.5-km Bengaluru–Chennai Expressway, which passes through Karnataka, Andhra Pradesh and Tamil Nadu, is now expected to become fully operational only by early 2027. The revised timeline follows delays linked to land acquisition hurdles, forest clearances and financial constraints.
The ambitious corridor, being implemented by the National Highways Authority of India (NHAI), has been designed to support vehicle speeds of up to 120 kmph. Once completed, it is projected to cut travel time between Bengaluru and Chennai from nearly six hours to just over two hours, offering a major boost to regional connectivity.
Of the total 263.5 km length, 234.8 km has already been completed, while 28.6 km remains under various stages of execution. The 71.7-km stretch in Karnataka is fully operational. In Andhra Pradesh, 78.5 km of the 85-km segment has been completed. Tamil Nadu has finished 84.7 km out of its total 106-km portion.
The project entails an overall investment of ₹17,692 crore. Officials indicated that delays were largely caused by financial stress faced by the concessionaire. Measures have since been initiated to replace the contractor through lender intervention to expedite the pending works.
Once the remaining sections are completed, the expressway is expected to greatly enhance inter-state movement, reduce congestion on existing highways and strengthen economic links between Bengaluru and Chennai.
Bengaluru–Chennai Expressway to be fully operational by 2027
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleEgmore station:  Extra buses operated to clear rush
Next Article Final voter list for 16 Chennai Assembly Constituencies out

Related Posts

CHENNAI

Biometric, face ID attendance made mandatory at Secretariat from June 1

May 30, 2026
CHENNAI

Key bureaucratic reshuffle across TN administration

May 30, 2026
CHENNAI

ESIC’s free annual health check-up camps for registered workers

May 30, 2026
CHENNAI

HC quashes Goondas Act detention in apartment fraud case

May 30, 2026
CHENNAI

Kanimozhi raises alarm over rising crimes

May 30, 2026
CHENNAI

EPS vacates bungalow at Greenways Road 

May 30, 2026
0 0 votes
Article Rating
Subscribe
Login
Notify of
guest
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Latest Posts

French Open: Fonseca stuns Djokovic 

AgencyMay 30, 20260

Paris, May 30: Brazilian teenager Joao Fonseca pulled off one of the biggest upsets of…

Mentally stressed Hardik is done with Mumbai 

AgencyMay 30, 20260

Mumbai, May 30: “Mentally stressed and completely exhausted” after what has been a disastrous IPL,…

Pant steps down from LSG captaincy

AgencyMay 30, 20260

Lucknow, May 30: Dashing keeper-batter Rishabh Pant has been relieved from Lucknow Super Giants’…

Gill’s 104 powers GT into IPL finals

AgencyMay 30, 20260

Mullanpur, May 30: Shubman Gill produced a conventional batting masterclass in the age of muscle…

Indian student found dead in Canada

AgencyMay 30, 20260

Ottawa, May 30: A 23-year-old Indian student, Vidhi Megha, was found dead inside a residence…

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • French Open: Fonseca stuns Djokovic 
  • Mentally stressed Hardik is done with Mumbai 
  • Pant steps down from LSG captaincy
  • Gill’s 104 powers GT into IPL finals
  • Indian student found dead in Canada
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

wpDiscuz
Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 1   +   10   =  
Lost password?