Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Wednesday, July 15, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • FIFA 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Chennai–Bengaluru bullet train project enters next phase
CHENNAI

Chennai–Bengaluru bullet train project enters next phase

The proposed Chennai–Bengaluru high-speed rail corridor has entered its next phase, with the National High Speed Rail Corporation Limited (NHSRCL) issuing a fresh tender to update the Detailed Project Report (DPR) and carry out new engineering surveys.
NT BureauBy NT BureauJuly 15, 2026No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

 

Chennai, July 15:

The proposed Chennai–Bengaluru high-speed rail corridor has entered its next phase, with the National High Speed Rail Corporation Limited (NHSRCL) issuing a fresh tender to update the Detailed Project Report (DPR) and carry out new engineering surveys.

The 306.2-kilometre corridor will connect key locations across Tamil Nadu, Andhra Pradesh, and Karnataka. In Tamil Nadu, the planned stations will include Chennai, Poonamallee, and Parandur. Notably, the Parandur station remains part of the project despite the shelving of the proposed greenfield airport in the area.

As part of the updated DPR process, the project will undergo a comprehensive review of its alignment along with advanced surveys using drone and LiDAR technology. The scope of work also includes geotechnical investigations, tunnel studies, river crossing assessments, station planning, and revised land acquisition strategies.

Officials have indicated that the DPR update and associated surveys are expected to be completed within 150 days. The latest developments mark a significant step forward in advancing the high-speed rail link, which is expected to enhance connectivity and reduce travel time between Chennai and Bengaluru.

The bullet train project is seen as a major infrastructure initiative aimed at boosting regional economic growth and modernizing intercity transport in southern India.

Chennai–Bengaluru bullet train project enters next phase
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticlePower shutdown areas for tomorrow 
Next Article Ukraine boosts air strength, downs five Russian missiles

Related Posts

CHENNAI

TN to revamp school midday meal menu

July 15, 2026
CHENNAI

Power shutdown areas for tomorrow 

July 15, 2026
CHENNAI

TN launches WhatsApp helpline to report bribery

July 15, 2026
CHENNAI

EPS rejects tie-up talk, targets TVK govt

July 15, 2026
CHENNAI

Seeman slams police action on protesting school girls

July 15, 2026
CHENNAI

Power cut areas for tomorrow 

July 14, 2026
0 0 votes
Article Rating
Subscribe
Login
Notify of
guest
guest
0 Comments
Oldest
Newest Most Voted
Latest Posts

Mahakali nears completion as PVCU’s most ambitious spectacle yet

NT BureauJuly 15, 20260

The much-anticipated mythological epic Mahakali, part of the expanding Prasanth Varma Cinematic Universe (PVCU), has entered its final phase of production after completing 125 days of shooting. Backed by RKD Studios,

Sarath Kumar teams up with Kingston filmmaker 

NT BureauJuly 15, 20260

Marking his birthday with a fresh announcement, veteran actor Sarath Kumar is set to headline a new film directed by Kamal Prakash, best known for helming Kingston. Tentatively titled Production No 12, the project will

Rajinikanth applauds Gatta Kusthi 2

NT BureauJuly 15, 20260

In a moment that has delighted fans and the film’s team alike, superstar Rajinikanth has lauded Gatta Kusthi 2, calling it a refreshing entertainer at a time when such films are “rare.” The praise was shared by actor-producer

Arulvaan will champion the cause of education: Arulnithi

AgencyJuly 15, 20260

Arulnithi is eagerly awaiting the release of Arulvaan. He says, ‘The movie serves a purpose. Speaks about how education transforms our lives’

India, Maldives make progress on FTA to boost bilateral trade

AgencyJuly 15, 20260

The government on Tuesday said that the first round of negotiations for the India-Maldives Free Trade Agreement (FTA) have been concluded successfully towards expanding bilateral trade and investment

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Mahakali nears completion as PVCU’s most ambitious spectacle yet
  • Sarath Kumar teams up with Kingston filmmaker 
  • Rajinikanth applauds Gatta Kusthi 2
  • Arulvaan will champion the cause of education: Arulnithi
  • India, Maldives make progress on FTA to boost bilateral trade
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

wpDiscuz
Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 2   +   7   =  
Lost password?