Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Wednesday, August 19, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • FIFA 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Anna Salai elevated road project faces delay
CHENNAI

Anna Salai elevated road project faces delay

The ₹621-crore Anna Salai elevated road project between Teynampet and Saidapet is likely to be delayed until February 2027 due to design and alignment issues identified during construction.
NT BureauBy NT BureauAugust 19, 2026No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai, Aug 19:

The ₹621-crore Anna Salai elevated road project between Teynampet and Saidapet is likely to be delayed until February 2027 due to design and alignment issues identified during construction.

Engineers reportedly found differences between the approved design and the structures being built, including variations in the alignment of some pillars. Around 80 pillars between Saidapet and Nandanam have already been planned or constructed.

The four-lane elevated corridor, designed to be 14 metres wide, is also being built close to the existing Nandanam–Teynampet Metro alignment, requiring careful coordination.

The Highways Department is reviewing the design and alignment before work can fully resume. Further modifications could push the completion date beyond February 2027.

Once completed, the elevated road is expected to ease congestion along the busy Teynampet–Nandanam–Saidapet stretch of Anna Salai.

Anna Salai elevated road project faces delay
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleIndiGo flight from Tiruchy to Chennai delayed by six hours
Next Article Railways to upgrade drinking water facilities at 20,000 locations

Related Posts

CHENNAI

Arumbakkam Metro to get seven-storey commercial complex

August 19, 2026
CHENNAI

Railways to upgrade drinking water facilities at 20,000 locations

August 19, 2026
CHENNAI

IndiGo flight from Tiruchy to Chennai delayed by six hours

August 19, 2026
CHENNAI

Chennai MRTS to be handed over to TN govt

August 19, 2026
CHENNAI

IIT-M research uncovers global patterns of marine microbial community assembly

August 18, 2026
CHENNAI

TN extends ITI direct admission deadline to August 31

August 18, 2026
0 0 votes
Article Rating
Subscribe
Login
Notify of
guest
guest
0 Comments
Oldest
Newest Most Voted
Latest Posts

Nine die in Kolkata hotel fire

NT BureauAugust 19, 20260

At least nine people, including a four-year-old child, died and six were injured in an early Wednesday fire at a dingy five-storey building on Mirza Galib Street in central Kolkata that housed several hotels, police said.

Arumbakkam Metro to get seven-storey commercial complex

NT BureauAugust 19, 20260

Chennai, Aug 19: Chennai Metro Rail Limited (CMRL) is planning to construct a multi-storey…

Railways to upgrade drinking water facilities at 20,000 locations

NT BureauAugust 19, 20260

Chennai, Aug 19: The Indian Railways has launched a major initiative to improve drinking water…

Anna Salai elevated road project faces delay

NT BureauAugust 19, 20260

Chennai, Aug 19: The ₹621-crore Anna Salai elevated road project between Teynampet and Saidapet is…

IndiGo flight from Tiruchy to Chennai delayed by six hours

NT BureauAugust 19, 20260

Chennai, Aug 19: An IndiGo flight from Tiruchy to Chennai was delayed by nearly…

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Nine die in Kolkata hotel fire
  • Arumbakkam Metro to get seven-storey commercial complex
  • Railways to upgrade drinking water facilities at 20,000 locations
  • Anna Salai elevated road project faces delay
  • IndiGo flight from Tiruchy to Chennai delayed by six hours
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

wpDiscuz
Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 3   +   3   =  
Lost password?