Close Menu
News Today | First with the news
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Monday, November 23, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • E-PAPER
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » What led to GSLC failure, reveals report
CHENNAI

What led to GSLC failure, reveals report

NT BureauBy NT BureauMarch 26, 2022No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: Deviation in the performance of the Cryogenic Upper Stage (CUS) about 297.3 secs after lift off led to the failure of the GSLV-F10/EOS-03 Mission on 12 August last year, the National Level Failure Analysis Committee (FAC) constituted by the Indian Space Research Organsiation (ISRO) said in its report.

The FAC consisting of experts from academia and ISRO, was constituted to identify the causes of the anomaly and to recommend corrective actions for future missions.

The FAC thoroughly reviewed the flight data along with all data related to the activities ranging from the stage preparation at the launch complex, countdown to lift-off.

The timeline of flight events and major observations on the Cryogenic Upper Stage in the GSLV-F10 mission along with all previous GSLV missions, were thoroughly discussed and deliberated.

The FAC observed that a deviation in performance of the Cryogenic Upper Stage (CUS) was observed at 297.3 sec after lift-off due to which the onboard computer aborted the mission at 307 sec, it said, in its report submitted to ISRO Thursday.

‘The ground servicing of the Cryogenic Stage was normal and the required lift-off conditions were achieved. However, subsequent to lift-off, the Committee observed that the build-up of pressure in the propellant (Liquid Hydrogen or LH2) tank during the flight was not normal leading to a lower tank pressure at the time of ignition of the engine’, it said, according to ISRO.

This resulted in anomalous operation of the Fuel Booster Turbo Pump (FBTP) mounted inside the LH2 tank which feeds the main turbopump of the engine resulting in insufficient flow of Liquid Hydrogen into the engine thrust chamber. Detailed studies indicate that the most likely reason for the observed reduction in LH2 tank pressure is a leak in the respective Vent and Relief Valve (VRV), which is used for relieving the excess tank pressure during flight.

Computer simulations as well as multiple confirmatory ground tests, closely simulating the conditions in the GSLV-F10 flight, validated the analysis by the FAC.

The FAC concluded that the lower LH2 tank pressure at the time of CUS engine ignition, caused by the leakage of Vent & Relief Valve (VRV) resulted in the malfunctioning of the Fuel Booster Turbo Pump (FBTP) leading to mission abort command and subsequent failure of the mission.

The most probable reason for the leakage of VRV valve is attributed to the damage in the soft seal that could have occurred during the valve operations or due to contamination and valve mounting stresses induced under cryogenic temperature conditions.

The committee has submitted comprehensive recommendations to enhance the robustness of the Cryogenic Upper Stage for future GSLV missions, which includes an active LH2 tank pressurization system to be incorporated to ensure sufficient pressure in the LH2 tank at the appropriate time before engine start command, strengthening of Vent and Relief Valve and associated fluid circuits to avoid the possibility of leakage along with the automatic monitoring of additional cryogenic stage parameters for giving lift-off clearance .

The FAC recommended a series of computer simulations and confirmatory ground tests to simulate the conditions very close to the GSLV-F10 flight scenario and validate the findings of the Committee.
Subsequently, the respective teams have completed the simulations and ground tests and presented the results, based on which FAC has completed its deliberations and presented its findings and conclusion Thursday.

The GSLV-F10/EOS-03 Mission lifted-off normally from Sriharikota on 12 August, 2021 at 5.43 am after a smooth countdown of 26 hours. In the flight, the performance of the first stage (GS1), the strap-on stages (L40) and the second stage (GS2) were satisfactory and in accordance with the pre-flight predictions. However, the onboard computer aborted the mission at 307 seconds into the flight leading to mission failure.

Initial investigations with the post-flight data conducted immediately after the launch indicated that an anomaly in the Cryogenic Upper Stage led to the mission abort.

 

chennai cryogenic upper stage indian space research organisation isro national level failure analysis committee newstoday newstodaynet newstodaynet online reveals report what led to gslc failure
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleTN Assembly session to resume on 6 April
Next Article Jadeja-led CSK to lock horns with KKR in opener match of IPL Season 15

Related Posts

TAMIL NADU

TVK to present second phase of student educational awards on Nov 26, 27

November 23, 2026
TAMIL NADU

Heavy rain, thunderstorms forecast across Tamil Nadu until Nov 28

November 23, 2026
NATION

PM Modi, Nepal PM Balendra Shah flag off direct Ayodhya–Janakpur train

November 23, 2026
NATION

 ‘Jwala Mk-1’ successfully tested at Pokhran

November 23, 2026
CHENNAI

Kasimedu fishermen return to sea

November 23, 2026
TAMIL NADU

DMK forms seven-member panel to gather Cauvery delta farmers’ views

November 23, 2026
Add A Comment

Comments are closed.

Latest Posts

Tasmac enforces digital payment above Rs 1,000 in Chennai

NT BureauNovember 23, 20260

The Tamil Nadu State Marketing Corporation (Tasmac) has implemented mandatory digital-only payments for retail liquor purchases exceeding Rs 1,000 across outlets in Chennai and neighbouring Tiruvallur East starting

Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR

PugazhNovember 23, 20260

Industrial and commercial properties require flooring that can withstand daily operational challenges. Manufacturing units, warehouses,…

TVK to present second phase of student educational awards on Nov 26, 27

NT BureauNovember 23, 20260

The Tamilaga Vettri Kazhagam (TVK) will host the second phase of its annual educational awards and financial assistance ceremony for meritorious Class 10 and Class 12 students at a private auditorium in Neelankarai,

Full ‘Beaver Supermoon’ to light up the sky tomorrow night

NT BureauNovember 23, 20260

Skywatchers across Tamil Nadu and India will witness a dazzling celestial spectacle on Tuesday, November 24, when the full ‘Beaver Supermoon’ illuminates the night sky, reaching its peak illumination at 8.23 pm IST.

Kim Jong Un ignores Trump’s multiple attempts to re-establish contact

NT BureauNovember 23, 20260

North Korean leader Kim Jong Un has repeatedly ignored outreach efforts by US President Donald Trump to revive bilateral dialogue, with Pyongyang’s mission at the United Nations even returning a personal letter from

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Tasmac enforces digital payment above Rs 1,000 in Chennai
  • Why Industrial and Commercial Spaces Are Switching to Modern Epoxy Flooring Solutions in Delhi NCR
  • TVK to present second phase of student educational awards on Nov 26, 27
  • Full ‘Beaver Supermoon’ to light up the sky tomorrow night
  • Kim Jong Un ignores Trump’s multiple attempts to re-establish contact
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 5   +   4   =  
Lost password?