Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Friday, November 6, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Kalpakkam: Nuclear regulator nod for fuel loading in PFBR
TAMIL NADU

Kalpakkam: Nuclear regulator nod for fuel loading in PFBR

NT BureauBy NT BureauJuly 30, 2024No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

India’s nuclear regulator AERB has granted permission to load fuel in the 500 MWe Prototype Fast Breeder Reactor (PFBR) at Kalpakkam and start the controlled chain reaction, taking it a step closer to producing power. The board of the Atomic Energy Regulatory Board (AERB) met at Kalpakkam in Tamil Nadu on Saturday and granted permission for ‘First Approach to Criticality’ including loading of fuel in the reactor that uses plutonium as nuclear fuel, an official statement said. The AERB also granted permission to conduct ‘Low Power Physics Experiments’ in PFBR. “In a fast reactor, the first criticality is achieved during the fuel loading process. This is the reason for granting permission for the three activities together,” a senior official said In March, Prime Minister Narendra Modi witnessed the core loading activity of PFBR. The core loading was initiated in phased manner beginning with insertion of control sub-assemblies followed by blanket sub-assemblies with necessary permissions from the AERB. The nuclear regulator had been carrying out extensive safety review and assessment through multi-tier safety review mechanism. The safety reviews are complemented with periodic inspections and observation by resident site observer team, the statement said. “The Board assured itself of the systematic regulatory oversight by the AERB, took cognizance of the detailed submissions presented, safety review outcomes tabled and also visited the plant. Based on the above, the said permission was granted,” the statement said. In the final stage of core loading, fuel sub-assemblies would be loaded in the core of the reactor following which nuclear fission process will commence. On attainment of sustained nuclear fission chain reaction, a phenomenon known as criticality of the reactor, various low power physics experiments would be conducted. This permission marks a significant step towards operationalization of PFBR. The 500MWe so

Kalpakkam: Nuclear regulator nod for fuel loading in PFBR
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleUdhayanidhi distributes Rs 13.98 cr to 589 TN athletes
Next Article DMK govt coercing funds for F4 Racing event: Annamalai

Related Posts

TAMIL NADU

Fishermen deaths: Political storm erupts in Tamil Nadu

November 6, 2026
TAMIL NADU

Leopard Snatches Pet Dog in Thalavadi

November 6, 2026
TAMIL NADU

Vigilance Raids Sand Mining Contractor

November 6, 2026
TAMIL NADU

Periyar Library Book Scam Alleged

November 6, 2026
TAMIL NADU

Anbil Mahesh Custody Extended to Nov 18

November 6, 2026
CHENNAI

Two lakh passengers leave Chennai by bus

November 6, 2026
Add A Comment

Comments are closed.

Latest Posts

Gaza war leaves lasting environmental destruction

AgencyNovember 6, 20260

Gaza, November 6: The war in Gaza has caused extensive environmental destruction, damaging agricultural land,…

Hasina vows to return to Bangladesh in December

AgencyNovember 6, 20260

Dhaka, November 6: Former Bangladesh Prime Minister Sheikh Hasina has reiterated her intention to return…

Eight killed in shooting spree in Turkiye

AgencyNovember 6, 20260

Istanbul, November 6: Eight people were killed and another seriously injured in shootings across three…

Trump showcases White House ballroom

AgencyNovember 6, 20260

Washington, November 6: US President Donald Trump focused on the construction of a new White…

India prepares for Nepal PM’s visit

AgencyNovember 6, 20260

Kathmandu, November 6: India and Nepal have begun preparations for Prime Minister Balendra Shah’s proposed…

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Gaza war leaves lasting environmental destruction
  • Hasina vows to return to Bangladesh in December
  • Eight killed in shooting spree in Turkiye
  • Trump showcases White House ballroom
  • India prepares for Nepal PM’s visit
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?