Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Saturday, November 7, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » CMRL launches tunnel boring machine for tunnelling in Kolathur
CHENNAI

CMRL launches tunnel boring machine for tunnelling in Kolathur

NT BureauBy NT BureauFebruary 20, 2025No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
The Chennai Metro Rail Limited (CMRL) has commenced underground tunneling for Corridor 5 of Phase II by launching its first tunnel boring machine (TBM), named Kurinji, at the Kolathur ramp on Wednesday.
Corridor 5, spanning 47 kilometers, connects Madhavaram Milk Colony to Sholinganallur, passing through key locations such as Koyambedu, Porur, and Alandur. It consists of five underground stations and 39 elevated stations.
As part of the project, CMRL has planned to deploy four TBMs, each named after traditional Tamil landscapes—Kurinji, Mullai, Marutham, and Neithal. According to a CMRL press note, TBM Kurinji will tunnel 246 meters from Kolathur ramp towards Kolathur station (upline) and is expected to complete its journey by June 2025. After retrieval, it will be relaunched from the south shaft to tunnel 1.06 km towards Srinivasa Nagar.
The second TBM, Mullai, is scheduled to arrive by the end of March and will start tunneling 603 meters from Villivakkam Railway Station towards the Villivakkam Bus Terminus. The remaining two TBMs, Marutham and Neithal, will be launched based on site readiness.
Tunneling Progress and Station Details
The 7.8 km underground section of Corridor 5 will have twin tunnels of 3.9 km each between Kolathur and Nathamuni ramps. The project is being executed by Tata Projects, which is responsible for deploying all four TBMs for the tunneling works.
The underground metro stations on this stretch include:
Kolathur Junction, Srinivasa Nagar,
Villivakkam, Villivakkam Bus Terminus,
Nathamuni (formerly named Villivakkam MTH Road metro station).
CMRL is undertaking the construction of three corridors as part of Phase II, covering a total distance of 118.9 km. Additionally, work on Corridor 4 between Poonamallee and Porur Junction is also in progress.
With the launch of TBM Kurinji, Chennai’s metro expansion takes a significant step forward, promising enhanced connectivity and improved urban mobility for the city’s residents.
CMRL launches tunnel boring machine for tunnelling in Kolathur
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleAnnamalai writes to TN DGP
Next Article Anna varsity’s new launch

Related Posts

CHENNAI

Chennai gold up Rs 160; silver reaches Rs 250/g

November 7, 2026
CHENNAI

Over 3.79 lakh leave Chennai on 8,296 festive buses

November 7, 2026
CHENNAI

Two lakh passengers leave Chennai by bus

November 6, 2026
CHENNAI

Deepavali airfares soar from Chennai

November 6, 2026
CHENNAI

Chennai techie dies by suicide

November 5, 2026
CHENNAI

Chennai gold rates jump Rs 2,280

November 5, 2026
Add A Comment

Comments are closed.

Latest Posts

E-paper 7 November 2026

Sudhakar RNovember 7, 20260

Chennai gold up Rs 160; silver reaches Rs 250/g

NT BureauNovember 7, 20260

Gold prices in Chennai edged higher by Rs 160 per sovereign on Saturday, driven by renewed retail interest and festive bullion demand.

TN extends crop loan waiver up to Rs 75,000 for 13.25L farmers

NT BureauNovember 7, 20260

The Tamil Nadu government has extended its crop loan waiver of up to Rs 75,000 to all eligible agricultural borrowers who availed credit from cooperative societies between May 1, 2025, and March 31, 2026, removing

TN launches Rs 2,000 cr Vetri laptop scheme

NT BureauNovember 7, 20260

Tamil Nadu Chief Minister C. Joseph Vijay has issued administrative sanction to implement the ‘Vetri Laptop Scheme’ at an outlay of Rs 2,000 crore for the 2026–27 academic year, benefiting students across government

Trump celebrates Diwali at White House

AgencyNovember 7, 20260

US President Donald Trump celebrated Diwali at the White House on Friday, joining prominent members of the Indian-American community to mark the Festival of Lights in the Oval Office.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 7 November 2026
  • Chennai gold up Rs 160; silver reaches Rs 250/g
  • TN extends crop loan waiver up to Rs 75,000 for 13.25L farmers
  • TN launches Rs 2,000 cr Vetri laptop scheme
  • Trump celebrates Diwali at White House
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?