Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Friday, July 31, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • FIFA 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » TN govt clears CMRL’s Koyambedu–Pattabiram corridor
CHENNAI

TN govt clears CMRL’s Koyambedu–Pattabiram corridor

NT BureauBy NT BureauMay 5, 2025No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
In a major infrastructure boost, the Tamil Nadu government has given its in-principle approval for the Chennai Metro Rail Limited’s (CMRL) proposed Koyambedu–Avadi–Pattabiram corridor. The approval follows the submission of the Detailed Project Report (DPR) by CMRL in February and paves the way for further processing at the central level.
The corridor, estimated to cost Rs. 9,928.33 crore, will span 21.76 km from the existing Koyambedu Metro station to Pattabiram, with 19 stations planned en route. The State government has also recommended the project to the Central government for approval, funding through equity participation, and assistance from bilateral or multilateral financial institutions.
Key station stops in the proposed stretch include Padi Pudhu Nagar, Park Road, Ambattur Estate, Dunlop, Thirumullaivoyal, Avadi Railway Station, and Hindu College, among others. Notably, the corridor will feature a double-decker structure at three locations, accommodating an elevated road on the first level and Metro rail on the second.
According to CMRL officials, the entire stretch will be elevated—similar to the Airport–Kilambakkam corridor. Construction is expected to take three years from the time the contract is awarded. Approximately 112 acres of land will be acquired for the project, which includes space for viaducts, stations, and a depot. Three-coach trains are planned for this line to accommodate projected passenger volumes.
The corridor is expected to significantly reduce travel time for thousands of daily commuters in areas such as Avadi, Thirunindravur, Ambattur, Pattabiram, and Mogappair, who currently depend on road transport and suburban rail. Public enthusiasm for the project is high, with residents anticipating faster and more reliable connectivity.
TN govt clears CMRL's Koyambedu–Pattabiram corridor
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleCM fears defeat, Focuses only on BJP-AIADMK alliance: Nainar 
Next Article Beat the heat in Chennai: What to wear to stay cool

Related Posts

CHENNAI

Power cut areas for tomorrow 

July 30, 2026
CHENNAI

TNPDCL orders recheck of 3.7 lakh connections after high power bills

July 30, 2026
CHENNAI

CM hands over TNPSC Group 1 appointment orders to 78 candidates

July 30, 2026
CHENNAI

CM Vijay reviews Chennai Metro expansion, driverless train

July 30, 2026
CHENNAI

TN govt splits HR&CE into North, South zones

July 29, 2026
CHENNAI

TN govt plans ₹7,000 cr Singappenngal scheme

July 29, 2026
Add A Comment

Comments are closed.

Latest Posts

E-paper 30 July 2026

NT BureauJuly 30, 20260

10 injured, seven critical after gas cylinder explodes in Thanjavur

NT BureauJuly 30, 20260

At least 10 people, including a 15-year-old girl, sustained severe burn injuries after an LPG cooking gas cylinder exploded on Thursday while locals were attempting to extinguish a house fire at Chinna Ammankudi in Thanjavur district, police said.

Cauvery row: K’taka CM invites Vijay to inspect drought-hit reservoirs

NT BureauJuly 30, 20260

The Cauvery water dispute has taken a fresh turn as Karnataka Chief Minister D.K. Shivakumar invited Tamil Nadu Chief Minister C. Joseph Vijay to personally visit the Cauvery reservoir regions in Karnataka to assess the severe water scarcity caused by an extreme drought.

Minister Ramesh announces key reforms in temple tender system

NT BureauJuly 30, 20260

In a significant move aimed at improving transparency and efficiency, Minister Ramesh has announced a comprehensive overhaul of the tender system governing temple operations across Tamil Nadu.

OPS denies rumours of joining TVK

NT BureauJuly 30, 20260

Former Chief Minister and current MLA O. Panneerselvam has dismissed reports claiming that he would resign his MLA post and join the TVK party.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 30 July 2026
  • 10 injured, seven critical after gas cylinder explodes in Thanjavur
  • Cauvery row: K’taka CM invites Vijay to inspect drought-hit reservoirs
  • Minister Ramesh announces key reforms in temple tender system
  • OPS denies rumours of joining TVK
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 0   +   8   =  
Lost password?