Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Friday, November 6, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Motorists using Ennore High Road get stuck on busy stretch, overbridge work stalled

Motorists using Ennore High Road get stuck on busy stretch, overbridge work stalled

NT BureauBy NT BureauJuly 25, 2019No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email
Motorists crossing Marshalling Yard track at Tondairpet.

Chennai: Motorists travelling from Ennore High Road to Chennai Central are put to hardship due to heavy traffic. They request the authorities to commence the second phase construction work on the rail overbridge.

The Ennore Road via Wall Tax Road, and Cochrane Basin Bridge Road is the short route connecting Central Chennai and Ennore, the northern gateway of Chennai.

Using Ennore Highway saves time by half-an-hour to reach Chennai Central Station. The route is now busy because of the diversion of vehicles from Tiruvottiyur High Road to Ennore High Road following Metro rail work.

The area is part of R K Nagar Assembly constituency and when former Chief Minister J Jayalalithaa was the MLA of the constituency, a rail overbridge construction project, worth Rs 137 crore, was announced to solve the traffic congestion.
The Greater Chennai Corporation has taken up the project. The first phase of rail overbridge was completed and opened 28 July 2017, but the second phase is yet to start.

Apart from road diversion, there is traffic chaos on Ennore High Road because of the presence of two railway level-crossings.

Latha, who runs a tender coconut shop near the railway crossing at Parameswaran Nagar, Ennore, said, “An accident took place on the track  a few years ago. After the incident, railway gates were put up on either side for public safety by IndianOil Corporation(IOC). The gates are closed four or five times per day by the IOC to allow its petroleum containers to pass through. Each time, motorists have to wait for at least half-an-hour.”

Next to Tondairpet, there is a similar railway crossing – Marshalling Yard. “This gate is closed for 15 to 20 minutes before the train’s arrival. It’ll be closed daily up to seven times. Schoolchildren and office-goers are mostly affected by it. Even in case of an emergency, the gate will not be opened and so even ambulances have to wait. The only solution for this problem is to build the overbridge,” the people in the locality said.

Data available with the traffic police show that Ennore Expressway records a traffic of over 2,000 vehicles during peak hours, per day.
When contacted, a senior GCC official said, “Tenders have been passed for the second phase of rail overbridge. We are waiting for the traffic police to make vehicular arrangements, to pave the way for construction work.”

(Article by Sundar Raj)

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleBhutia bats for promotion-relegation system in India
Next Article Tamil Thalaivas first aim to reach play-offs
Add A Comment

Comments are closed.

Latest Posts

Gaza war leaves lasting environmental destruction

AgencyNovember 6, 20260

Gaza, November 6: The war in Gaza has caused extensive environmental destruction, damaging agricultural land,…

Hasina vows to return to Bangladesh in December

AgencyNovember 6, 20260

Dhaka, November 6: Former Bangladesh Prime Minister Sheikh Hasina has reiterated her intention to return…

Eight killed in shooting spree in Turkiye

AgencyNovember 6, 20260

Istanbul, November 6: Eight people were killed and another seriously injured in shootings across three…

Trump showcases White House ballroom

AgencyNovember 6, 20260

Washington, November 6: US President Donald Trump focused on the construction of a new White…

India prepares for Nepal PM’s visit

AgencyNovember 6, 20260

Kathmandu, November 6: India and Nepal have begun preparations for Prime Minister Balendra Shah’s proposed…

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Gaza war leaves lasting environmental destruction
  • Hasina vows to return to Bangladesh in December
  • Eight killed in shooting spree in Turkiye
  • Trump showcases White House ballroom
  • India prepares for Nepal PM’s visit
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?