Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Friday, October 9, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • Asian Games 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home Ā» ‘Nirmal’ Ganga: Govt plans to finish 200 projects for ghats, crematoria by 2019

‘Nirmal’ Ganga: Govt plans to finish 200 projects for ghats, crematoria by 2019

PTIBy PTIOctober 21, 2018No Comments
🌐 Translate ā–¾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

New Delhi: In a bid to actualise the dream of a “nirmal” and “aviral” Ganga, Union minister Nitin Gadkari said Sunday the government is looking to complete about 200 projects for ghats and crematoria by March 2019.

Also, the Centre is taking various measures to ensure ecological flow or the minimum quantity of water at different stretches of the Ganga, he said.

“A total of 227 projects have been taken up for the Ganga for sewage infrastructure, ghats and crematoria, river-front development, river-surface cleaning and bio-diversity conservation, among others, at a cost of Rs 22,374 crore,” Gadkari, who holds Ganga rejuvenation and water resources portfolio among others, told PTI in an interview. He further said that making the Ganga “nirmal” (cleaner) and “aviral” (free-flowing) is his dream and his ministries were taking a slew of steps in this direction.

Earlier this month, the government had mandated the minimum ecological flow in the river Ganga and its tributaries required to be maintained at different points in different areas round the year with the aim of ensuring water quality and environmentally sustainable rejuvenation.

The directive also requires hydropower projects along the river to modify their operations in order to comply with the notification. “The government plans to complete 151 ghats and 54 crematoria projects by March 2019,” Gadkari, who is also in-charge of road transport and highways ministry, said.

Besides monitoring water quality at 138 locations, each at the interval of 20 km, projects have been taken up for 24×7 cleaning of ghats at Varanasi, Bithoor, Kanpur, Allahabad, Mathura, Vrindavan and Haridwar to avoid solid waste disposals in the river, he said.

In addition, under the bio-diversity conservation plans, several projects are being implemented for conservation and restoration of indigenous and aquatic species of the Ganga like Gangetic dolphin, river otters, turtles and aquatic birds, the minister added. The gazette notification on October 10 with regard to ecological flow of the Ganga water specifies flow requirements at various stretches including from origins in the glaciers to Haridwar besides the main stretch from Haridwar in Uttarakhand to Unnao, Uttar Pradesh.

Gadkari said: “With implementation of these specifications, the river will not be dry as these specifications were a result of scientific study.” He said the directive on ecological flow for the river would result in an unhindered and continuous flow of the river water as it will ensure at least the minimum required environmental flow of water even after its stream gets diverted by projects.

The minister said the notification also provides for direct release of additional water in the river Ganga to meet special demand as and when required. “The concerned central and state authorities shall implement demand side management plans to reduce water withdrawal from the river Ganga by adopting good and scientific practices such as efficient method of irrigation, reuse and recycle of water including monitoring and regulation of ground water withdrawals for various purposes,” the notification mentioned.

There are about 1,100 industries and 4,500 villages along the Ganga. The minister last month said that cleaning works would start getting remarkably noticeable in another six months, and had claimed “transforming the river that was the distinct cultural identify of the nation was close to his heart”.

Enunciating the work for sewage infrastructure, the minister had said: “Massive initiatives have resulted in rich dividends and we have successfully created capacity to treat 1,700 MLD sewage.”

The cities located by the side of the river produce 2,950 MLD sewage and if steps to purify the water were not taken this in another 15 years will reach 3,600 MLD. He said there were 97 cities, which were polluting the river with 10 including Haridwar, Kanpur, Allhabad, Varanasi, Patna, Bhagalpur and Kolkata contriubting 65 per cent of the pollution in the river.

Besides, Gadkari has said 48 new cities have been identified on either side of the Ganga and its tributaries for projects to clean the river. The government had in May 2015 approved Rs 20,000 crore under its ambitious ‘Namami Gange‘ – integrated Ganga integrated Ganga conservation mission – programme for five years. The minister said massive preparations were also on for commencement of cargo operations in Ganga.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleLocals continue protest at train accident site in Amritsar
Next Article 21 October 2018
Add A Comment
Leave A Reply

Latest Posts

Security tightened at Chennai airport ahead of Modi’s visit

NT BureauOctober 9, 20260

Security has been intensified at Chennai Airport ahead of Prime Minister Narendra Modi’s visit on Sunday, October 11.

Body-shaming row: TVK files complaints against StalinĀ 

NT BureauOctober 9, 20260

The women’s wing of the Tamilaga Vettri Kazhagam (TVK) on Thursday filed complaints against DMK president M K Stalin at five police stations in Tiruchy, accusing him of making a body-shaming remark against TVK’s Dharapuram by-election candidate P Sathyabama during the election campaign.

HC asks DVAC not to act against E V Velu, son till Oct 15

NT BureauOctober 9, 20260

The Madras High Court on Friday orally suggested that the Directorate of Vigilance and Anti-Corruption (DVAC) not take any action against former DMK minister E V Velu and his son E V Kumaran till October 15, 2026, in connection with an FIR over the alleged excavation of lake-bed material for a DMK conference in Tiruvannamalai district.

Nagaon bypolls: BJP leads over AIUDF’s Ajmal by one lakh votes

NT BureauOctober 9, 20260

BJP candidate Devasish Sharma has polled 4,10,738 votes in the Nagaon Lok Sabha by-election, extending his lead over AIUDF chief Mohammed Badruddin Ajmal to 1,06,969 votes, according to the Election Commission of India as of 2.26 pm. Ajmal has secured 3,03,769 votes.

Maragatham Kumaravel thanks Madurantakam votersĀ 

NT BureauOctober 9, 20260

TVK candidate Maragatham Kumaravel has thanked the people of Madurantakam constituency following her victory in the Assembly by-election.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • Security tightened at Chennai airport ahead of Modi’s visit
  • Body-shaming row: TVK files complaints against StalinĀ 
  • HC asks DVAC not to act against E V Velu, son till Oct 15
  • Nagaon bypolls: BJP leads over AIUDF’s Ajmal by one lakh votes
  • Maragatham Kumaravel thanks Madurantakam votersĀ 
Ā© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Lost password?