Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Tuesday, April 28, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • Tamilnadu Election 2026
  • Puducherry Election 2026
  • Other States Elections 2026
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • IPL 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home » Port-Maduravoyal expressway to get underway, cost revised to Rs 2.4K cr

Port-Maduravoyal expressway to get underway, cost revised to Rs 2.4K cr

NT BureauBy NT BureauOctober 21, 2018No Comments
🌐 Translate ▾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: The National Highway Authority of India (NHAI) will resume the Chennai Port-Maduravoyal elevated expressway and the project cost has been revised to Rs 2,400 crore from Rs 1,815 crore. Authorities have confirmed that the existing pillars constructed at Koyambedu would be used for the project.

NHAI has prepared a new revised detailed project report (DPR) for the elevated expressway. Union Minister of State for Finance and Shipping Pon Radhakrishnan confirmed the same and there had been many reports in news regarding the details of the project that was stalled by the erstwhile J Jayalalithaa government, citing environmental violations.

In the latest development, the project’s executing agency, NHAI is gearing to resume work on the 19-km expressway soon and authorities have confirmed that they would use the existing completed pillars after inspecting their structural strength and safety.

Sources in NHAI said, “There is no significant change in the alignment of the road. We are sticking to the original plan. Land acquisition for the project has been initiated and authorities are in the process of floating a new tender for the revised programme.”

Authorities confirmed that the twin pillars constructed for nearly five km at Koyambedu and on the Cooum River banks in Chetpet would be used. “An expert team would inspect the pillars to check the structural stability and ageing factor. Recommendations of the State government will also be taken into account,” officials said.

The Maduravoyal-Port expressway project was started in September 2010, but it was stalled in 2011 by the Jayalalithaa government stating that the construction of pillars on the Cooum river would have an adverse impact on the environment and would also result in flooding during monsoon.

Nearly 14 km of the 19 km elevated expressway runs along the Cooum. The corridor once completed is expected to de-congest traffic in Ambattur Estate Road and Ponamallee High Road.

Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleInjured Messi set to miss El Clasico
Next Article Rousing reception for Mauritius acting Prez
0 0 votes
Article Rating
Subscribe
Login
Notify of
guest
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Latest Posts

E-paper 28 April 2026

NT BureauApril 28, 20260

West Bengal gears up for phase 2 polling tomorrow * Mamata vs BJP heats Up after 90% turnout in phase 1

NT BureauApril 28, 20260

West Bengal gears up for phase 2 polling tomorrow * Mamata vs BJP heats Up after 90% turnout in phase 1

Bangladesh faces surge in mob violence

NT BureauApril 28, 20260

A report has warned that mob violence in Bangladesh is becoming a growing national crisis amid declining trust in the justice system.

Pak repels Taliban infiltration, 3 injured

NT BureauApril 28, 20260

Three civilians, including two women, were injured on Monday in alleged cross-border firing by Afghan Taliban forces following a failed infiltration attempt by militants along the Pakistan-Afghanistan border in South Waziristan, according to a security official. 

Road mishap: Bus driver killed, 40 injured near Tindivanam

NT BureauApril 28, 20260

A government bus driver was killed and around 40 passengers were injured after a lorry rammed into a bus near Tindivanam on Tuesday.

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 28 April 2026
  • West Bengal gears up for phase 2 polling tomorrow * Mamata vs BJP heats Up after 90% turnout in phase 1
  • Bangladesh faces surge in mob violence
  • Pak repels Taliban infiltration, 3 injured
  • Road mishap: Bus driver killed, 40 injured near Tindivanam
© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

wpDiscuz
Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 4   +   5   =  
Lost password?