Close Menu
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
  • E-PAPER
Facebook X (Twitter) Instagram Threads YouTube
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions
Friday, April 24, 2026
Facebook X (Twitter) Instagram
News Today | First with the newsNews Today | First with the news
Login / Register Subscribe
  • HOME
  • TAMIL NADU
  • CHENNAI
  • NATION
  • WORLD
  • BUSINESS
  • SPORTS
  • ENTERTAINMENT
  • EDIT
  • COLUMNS
    • POINTBLANK
    • WHY TN IS FORBIDDEN LAND
  • MIXED BAG
    • CLIMATE & WEATHER
    • EDUCATION
    • HEALTH
    • JOBS
    • LEGAL
    • LIFESTYLE
    • SCIENCE
    • TECHNOLOGY
News Today | First with the newsNews Today | First with the news
  • Tamilnadu Election 2026
  • Puducherry Election 2026
  • Other States Elections 2026
  • E-PAPER
  • POINTBLANK
  • PRIME PULSE
  • TN ECHOES
  • IPL 2026
  • DEEP DIVE
  • GLOCAL
  • COLD FACTS
  • LEADING LIGHTS
  • CRYSTAL GAZING
  • PATTERNS
Home Ā» What led to GSLC failure, reveals report
CHENNAI

What led to GSLC failure, reveals report

NT BureauBy NT BureauMarch 26, 2022No Comments
🌐 Translate ā–¾
  • Tamil
  • Hindi
  • Malayalam
  • Kannada
  • Telugu
Share WhatsApp Facebook Twitter LinkedIn Pinterest Telegram Copy Link Email

Chennai: Deviation in the performance of the Cryogenic Upper Stage (CUS) about 297.3 secs after lift off led to the failure of the GSLV-F10/EOS-03 Mission on 12 August last year, the National Level Failure Analysis Committee (FAC) constituted by the Indian Space Research Organsiation (ISRO) said in its report.

The FAC consisting of experts from academia and ISRO, was constituted to identify the causes of the anomaly and to recommend corrective actions for future missions.

The FAC thoroughly reviewed the flight data along with all data related to the activities ranging from the stage preparation at the launch complex, countdown to lift-off.

The timeline of flight events and major observations on the Cryogenic Upper Stage in the GSLV-F10 mission along with all previous GSLV missions, were thoroughly discussed and deliberated.

The FAC observed that a deviation in performance of the Cryogenic Upper Stage (CUS) was observed at 297.3 sec after lift-off due to which the onboard computer aborted the mission at 307 sec, it said, in its report submitted to ISRO Thursday.

‘The ground servicing of the Cryogenic Stage was normal and the required lift-off conditions were achieved. However, subsequent to lift-off, the Committee observed that the build-up of pressure in the propellant (Liquid Hydrogen or LH2) tank during the flight was not normal leading to a lower tank pressure at the time of ignition of the engine’, it said, according to ISRO.

This resulted in anomalous operation of the Fuel Booster Turbo Pump (FBTP) mounted inside the LH2 tank which feeds the main turbopump of the engine resulting in insufficient flow of Liquid Hydrogen into the engine thrust chamber. Detailed studies indicate that the most likely reason for the observed reduction in LH2 tank pressure is a leak in the respective Vent and Relief Valve (VRV), which is used for relieving the excess tank pressure during flight.

Computer simulations as well as multiple confirmatory ground tests, closely simulating the conditions in the GSLV-F10 flight, validated the analysis by the FAC.

The FAC concluded that the lower LH2 tank pressure at the time of CUS engine ignition, caused by the leakage of Vent & Relief Valve (VRV) resulted in the malfunctioning of the Fuel Booster Turbo Pump (FBTP) leading to mission abort command and subsequent failure of the mission.

The most probable reason for the leakage of VRV valve is attributed to the damage in the soft seal that could have occurred during the valve operations or due to contamination and valve mounting stresses induced under cryogenic temperature conditions.

The committee has submitted comprehensive recommendations to enhance the robustness of the Cryogenic Upper Stage for future GSLV missions, which includes an active LH2 tank pressurization system to be incorporated to ensure sufficient pressure in the LH2 tank at the appropriate time before engine start command, strengthening of Vent and Relief Valve and associated fluid circuits to avoid the possibility of leakage along with the automatic monitoring of additional cryogenic stage parameters for giving lift-off clearance .

The FAC recommended a series of computer simulations and confirmatory ground tests to simulate the conditions very close to the GSLV-F10 flight scenario and validate the findings of the Committee.
Subsequently, the respective teams have completed the simulations and ground tests and presented the results, based on which FAC has completed its deliberations and presented its findings and conclusion Thursday.

The GSLV-F10/EOS-03 Mission lifted-off normally from Sriharikota on 12 August, 2021 at 5.43 am after a smooth countdown of 26 hours. In the flight, the performance of the first stage (GS1), the strap-on stages (L40) and the second stage (GS2) were satisfactory and in accordance with the pre-flight predictions. However, the onboard computer aborted the mission at 307 seconds into the flight leading to mission failure.

Initial investigations with the post-flight data conducted immediately after the launch indicated that an anomaly in the Cryogenic Upper Stage led to the mission abort.

 

chennai cryogenic upper stage indian space research organisation isro national level failure analysis committee newstoday newstodaynet newstodaynet online reveals report what led to gslc failure
Share. WhatsApp Facebook Twitter Telegram Copy Link Email
Previous ArticleTN Assembly session to resume on 6 April
Next Article Jadeja-led CSK to lock horns with KKR in opener match of IPL Season 15

Related Posts

TAMIL NADU

TN records historic 85.15% polling, highest since IndependenceĀ Ā 

April 24, 2026
NATION

HC rejects Pawan Khera’s anticipatory bail plea

April 24, 2026
TAMIL NADU

Stalin holds meeting with DMK Candidates after polls

April 24, 2026
NATION

TMC goons won’t find a place to hide after May 4: Modi

April 24, 2026
NATION

11 killed in multi-vehicle crash in UP

April 24, 2026
NATION

India extends airspace ban for Pak planes

April 24, 2026
Add A Comment

Comments are closed.

Latest Posts

E-paper 24 April 2026

NT BureauApril 24, 20260

India slams Trump over ā€˜hellhole’ remark

AgencyApril 24, 20260

New Delhi,Ā  Apr 24: India has strongly criticised US President Donald Trump after he amplified…

China envoy, Pak PM review West Asia situation

AgencyApril 24, 20260

Islamabad,Ā  Apr 24: Chinese Ambassador to Pakistan Jiang Zaidong met Prime Minister Shehbaz Sharif…

Nepal President halts Parliament session

AgencyApril 24, 20260

Kathmandu, Apr 24: Nepal President Ramchandra Paudel on Thursday suspended the session of both…

Israel, Lebanon to resume ceasefire talks

AgencyApril 24, 20260

Washington, Apr 24: Lebanon and Israel are preparing for a second round of rare…

About
About
Facebook X (Twitter) Instagram RSS
Latest Posts
  • E-paper 24 April 2026
  • India slams Trump over ā€˜hellhole’ remark
  • China envoy, Pak PM review West Asia situation
  • Nepal President halts Parliament session
  • Israel, Lebanon to resume ceasefire talks
Ā© 2026 NewsTodayNet.com. All Rights Reserved. Designed & Maintained by Gifted Technologies.
  • About us
  • Contact Us
  • Privacy Policy
  • Terms and Conditions

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.

Sign In or Register

Welcome Back!

Login to your account below.

Prove your humanity: 2   +   3   =  
Lost password?